Performance Work Statement (PWS)
Rural Urban Training (RUT) Exercise – Floodlight Support 26th Marine Expeditionary Unit (MEU)
1. Background
This Performance Work Statement (PWS) defines the requirements for commercial floodlight tower services at Fort Stewart in support of the 26th Marine Expeditionary Unit (MEU) Rural Urban Training (RUT) Exercise.
2. Scope
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, fuel, and supervision necessary to deliver, position, maintain, refuel, and recover commercial mobile floodlight towers at the designated Ammunition Holding Area (AHA) tactical support location. The contractor shall provide 24/7 maintenance and fuel sustainment throughout the period of performance.
3. Performance Requirements
3.1 General Equipment Requirements
For all supplied equipment, the contractor shall:
Provide 24/7 maintenance support for all light towers, ensuring continuous operational readiness, and provide equipment malfunction acknowledgement and an actionable response plan within two (2) hours of Government notification. Provide a single designated Point of Contact (POC) available 24/7 throughout the Period of Performance to coordinate operations, maintenance, refueling, and resolve any equipment discrepancies within six (6) hours of Government notification. Oversee complete equipment delivery, setup, and teardown in full compliance with safety standards and installation/range control directives. Equipment setup may begin as early as November 1, 2026, and all light towers must be fully positioned, fueled, and operational no later than 1200 EST on November 2, 2026. Equipment recovery may begin as early as 1800 EST on November 24, 2026, and must be completed no later than 0800 EST the following morning (November 25, 2026). Conduct thorough site inspection and cleanup during and after maintenance, delivery, and teardown activities. The site must be restored to its original condition with zero spills, debris, or equipment residue. Ensure all floodlight units comply with environmental safety regulations, including secondary containment or spill-prevention protocols during refueling and operation. In the event of inclement weather or mission changes resulting in exercise postponement or cancellation, upon notification exclusively from the Contracting Officer, remove all equipment on an expedited schedule. Coordinate with the Government Technical Point of Contact (TPOC) to finalize delivery routes and specific drop points at the designated site.