Performance Work Statement
for
C-5 MLG Trunnion Bearing Assembly
Purchase Request: FD2060-27-00013
7 April 2026
PR: FD2060-27-00013 PWS REVISION: 0
1.0 Description of Services.
1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to remanufacture the C-5 Main Landing Gear, Trunnion Bearing Assembly, NSN: 3120-00-7662056UC, Part No., 4F23832-103A, resulting in the installation of a re-manufactured Spherical Bearing, P/N: 4F9004-101A, into the existing serviceable condition, Housing Assembly, P/N: 4F23215-103A. Contractor shall provide all resources needed to inspect, accomplish functional testing and depot level remanufacture of the commodities covered by this PWS to meet contract delivery schedules. Remanufactured assets shall be made serviceable and be tested to the Original Equipment Manufacturer’s Acceptance Test Procedures (ATPs). The Contractor shall (1) remanufacture all units on contract for which a reparable carcass has been provided within the contract delivery schedules with no more than one exceptions per order, (2) provide timely monthly report accurately detailing number of units on hand, number of units in work, and stage of unit in the remanufacture process by serial number. Data shall be submitted per Contract Data Requirements List (CDRL).
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by providing serviceable, Main Landing Gear Trunnion Bearings that support requirements for the C-5 Heavy Duty Cargo Mission.
1.3 Background: This item is required for 100% change-outs for C-5 Programmed Depot Maintenance (PDM) at Robins AFB, Ga. at a quantity of eight (8) ea. per aircraft. This is a C-5 Engineering Requirements Review Type item. Regular preventive maintenance on Eight-Year, PDM cycles are accomplished at Robins to provide better reliability and maintainability for the C-5 Heavy Duty Cargo Mission.
2.0 Services Summary
Performance Objective
Quality of
Remanufacture
PWS
Reference
4.3.6
Performance Threshold
Remanufactured assets shall pass Gov’t DCMA
final breakaway torque inspections with no more
than one failure per contract year. At a
minimum, 95% of remanufactured assets shall
pass initial inspection. Remaining 5% (or less)
of failed assets shall pass on the second attempt.
There shall be no more than one PQDR and/or
QDR per contract year.
3.0 Government Property
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in