RFV
Updated
A PDF document (210 KB) attached to C-5 MLG Trunnion Bearing, from the Department of the Air Force. Due Oct 27, 2026, 5:00 PM (UTC-4).
File name: A006 RFV SESS-80640E.pdf
The full file is for paid members, or buy this bid alone.
Preview
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A-E
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
C5 TRUNNION BEARING
1. DATA ITEM NO.
A006
8. APP CODE
See Blk 16
F. CONTRACTOR
3. SUBTITLE
Request for Variance (RFV)
Deviation from Source Data
5. CONTRACT REFERENCE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
D
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
See Blk 16
See Blk 16
NSP
18. ESTIMATED
TOTAL PRICE
6. REQUIRING OFFICE
PWS Para 4.5.3
409 SCMS/GUMA
14.
DISTRIBUTION
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
b. COPIES
a. ADDRESSEE
See Blk 16
16. REMARKS
Exhibit
A
B
C
D
E
17. PRICE GROUP
2. TITLE OF DATA ITEM
DI-SESS-80640E
See Blk 16
x
FD2060-27-00013
4. AUTHORITY (Data Acquisition Document No.)
7. DD 250 REQ
Final
Draft
Reg
PCO
PM
Data Item No Performance Period
A006
Base Year Period
B006
Ordering Period 1
C006
Ordering Period 2
D006
Ordering Period 3
E006
Ordering Period 4
Repro
DI-SESS-80640E, as reflected at https://quicksearch.dla.mil/qsSearch.aspx, shall be followed as appropriate.
Block 7 and Block 8: Inspection and Acceptance will occur at Destination. WAWF submission for this Data item is not required. A Letter of Transmission (LT) in the form of email correspondence, as detailed in Block 14, shall be utilized for Inspection and Acceptance proceedings. If DCMA is assigned to the contract, the Contractor shall coordinate the submission of the RFV with the assigned DCMA Office for review and recommendation,. Upon completion of DCMA
The beginning of the document. Download the full file to read on.
Other documents in this bid
- End Item Reporting 27-00013
- CDM Production Report Monthly
- GOV. PROPERTY ANNUAL INV REPORT
- IUID Marking Activity Report
- ACCIDENT INCIDENT REPORT
- AFMC 158 Packaging Requirements
- DD FORM 1653 Transportation Requirements
- Bid document
- GFP ATTACHMENT
- Performance Work Statement
- Source Pre-Qualification Trunnion Bearings