PERFORMANCE WORK STATEMENT

(PWS)
Project Title: 12-Strand, 150-Foot Single Mode (SM) Fiber Optic Cable Installation and Upgrades for NINJA System
Location: Air Traffic Control (ATC) Tower, Dobbins Air Reserve Base (ARB)

1.0 General Scope

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the installation of a new 12-strand, 150-foot (150ft) Single Mode (SM) fiber optic cable at the Dobbins ARB ATC Tower. This new SM fiber will replace an existing legacy multimode (MM) fiber run currently supporting the Negation of Improvised Non-State Joint Aerial-Threats (NINJA) system.

1.1 Background

The existing multimode fiber linking the 1st floor communication room to the observation deck is being upgraded to single-mode fiber to support the enhanced bandwidth, reduced latency, and distance requirements of the upgraded NINJA drone suppressant system.

2.0 Specific Requirements

The contractor shall execute the following tasks:

2.1 Fiber Optic Cable Installation

•

•

Routing: Install, route, and secure one (1) continuous 12-strand, 150-foot SM fiber optic cable from the designated telecommunications rack on the 1st floor to the designated equipment rack on the observation deck of the Dobbins ARB ATC Tower.
Pathway: Utilize existing conduit, cable trays, and riser pathways where available. If existing pathways are at capacity, the contractor must provide and

•

install necessary innerduct or j-hooks strictly adhering to building fire codes and base infrastructure standards.
Service Loops: Provide a minimum of 15 feet of service loop at both the 1stfloor origination point and the observation deck termination point to accommodate future adjustments and re-terminations.

2.2 Hardware and Accessories

The contractor shall furnish and install all necessary termination hardware, including but not limited to:
•

Lightguide Interconnect Units (LIU):

•
•
•

•

•
•

Install one (1) rack-mountable LIU enclosure on the 1st floor. Install one (1) rack-mountable LIU enclosure on the observation deck. LIUs shall be sized appropriately for a 12-strand termination (e.g., standard 1RU rack-mountable enclosures fitted with compatible 12-port adapter panels).
Connectors and Pigtails: Terminate all 12 strands at both ends using factorypolished LC-APC (or otherwise specified by the NINJA system technical requirements) pigtails seamlessly fusion-spliced to the trunk cable. Splice Trays & Management: Provide and install compatible splice trays, splice