Questions and Answers for fiber optic cable at the Dobbins ARB ATC Tower
Updated
A PDF document (170 KB) attached to Cable Fiber Install ATC Tower Dobbins ARB, from the Department of the Air Force.
File name: Final Questions and Answers for FA670326Q0015 fiber optic cable at the Dobbins ARB ATC Tower.pdf
The full file is for paid members, or buy this bid alone.
Preview
Questions and Answers for FA670326Q0015 fiber optic cable at the Dobbins ARB ATC Tower
1 Question
Answer
2 Question
Answer
3 Question
Answer
4 Question
Answer
5 Question
Answer
6 Question
Answer
7 Question
Answer
8 Question
Answer
9 Question
Answer
10 Question
Answer
11 Question
Is attendance at a site visit mandatory for offerors? If so, please confirm the scheduled date/time and any visitor-access submission deadline.
No
Is a Georgia low-voltage/electrical contractor license specifically required for this fiber installation scope, and if so, which classification is acceptable?
no
Are bid, payment, or performance bonds required for this acquisition? No
May the prime contractor perform through a qualified licensed fiber/low-voltage subcontractor, subject to all applicable smallbusinesssubcontracting/limitations requirements?
Yes
For FA670326Q0015, the RFQ lists wage determination 2015-4471 revision 37, which we have recovered, but we did not find FAR 52.222-41 in the 15-page RFQ clause inventory.
52.222-41 or its equivilent will be added in Amendment 2 Does identified vacant or slightly filled conduit run from the first floor in the ATC Tower to the observation deck? yes there is a path from the 1st floor to the observation deck utilizing the multimode path that exist. Can we view the blueprint of the ATC Tower including all floors (1-7, roof)? No
Can another Site Visit be scheduled to see the pathway of the conduit on all floors (1-7) to determine the orientation of the closets on each floor and if floor penetrations have to be done?
No to site visit
. Which rack will house the LIU on the observation deck? if available utilize the existing multimode/fiber panel on the observation deck. If no room inside install new LIU on the observation deck connecting to the existing path for connection to system
Will the current MaxCell be used to install new single mode fiber? if available utilize the existing multimode/fiber panel on the observation deck. If no room inside install new LIU on the observation deck connecting to the existing path for connection to system
Will armored fiber be required?
Answer
it will need to protected from any weather by fiber approved commercial best practices.
12 Question
Answer
13 Question
Answer
Answer
Answer
Answer
Answer
18 Question
Answer
Approved Fiber Route – Provide any existing route drawings or confirm contractor-proposed routing is acceptable.
Labeling Convention – Confirm required labeling format beyond ANSI/TIA-606-C (e.g., color codes, naming schema).