Performance Work Statement Hoist and Crane
Updated
A PDF document (248 KB) attached to Hoist and Cranes Maintenance Services FY27, from the Department of the Air Force. Due Nov 5, 2026, 11:30 AM (UTC-6).
File name: PWS Hoist and Crane 1 Oct 2026.pdf
The full file is for paid members, or buy this bid alone.
Preview
updated 1 Oct 2026
PERFORMANCE WORK STATEMENT (PWS)
Hoist and Crane Inspection, Repair and Testing Services Hangar Doors & Tail Enclosures Inspection, Maintenance and Repair Services 1.0 DESCRIPTION OF SERVICE.
1.1 Description of Service. The contractor shall provide all labor, equipment, lifts, tools, materials, supplies, and other items and services necessary to perform the inspection, load testing, maintenance, repairs, evaluation, and certification for hoists/cranes and perform inspections, maintenance and repair services for hangar doors and tail enclosures at Hurlburt Field, Florida as defined in this PWS.
1.2 Inspection and Testing/Certification of Hoists/Cranes. All hoists and cranes shall be inspected, tested, and certified in accordance with 29 CFR 1910.179. The contractor shall also adhere to Air Force Occupational Safety and Health Standard (AFOSH STD) 91-46. The initial inspection for all units listed in Appendix A shall be completed within 45 days after the contract has been awarded. Periodic Inspection frequency for the hoists/cranes shall be based on request by the 1 SOCES/CEOES contracting officer representative (COR). The list of hoists and cranes are located in Appendix A. The government reserves the right to add or remove cranes by negotiation and subsequent written modification to the contract from this list should additional cranes be identified during real property inventory.
1.2.1 Replacement Parts. The Contractor shall acquire all parts and materials necessary for preventative maintenance and minor repairs and shall only use original manufacturer or approved equal material/parts. The contractor shall remove and replace items in accordance with manufacturer's instructions, local, state, and federal procedures. 1.2.1.1 Minor Repairs. The contractor will be required to perform minor repairs on the hoist/crane as part of this contract. Minor repairs can be defined as maintenance measures to restore each trainer to its full operating capability without the replacement of major parts. 1.2.1.2 Repairs. The contractor shall make all repairs on all hoists/cranes in order for the hoist/crane to be considered fully operational. Repair costs shall not exceed 50% of the hoist/crane replacement value without approval of COR. Government shall make the final determination on if a hoist/crane is not repaired.
1.2.1.3 MAJOR REPAIRS. The contractor will be required to perform major repairs on the Hoist and Cranes as part of this contract. Major repairs can be define as
The beginning of the document. Download the full file to read on.