Home / FLETC Cheltenham Integrated Solid Waste/Recycle Disposal / Document

Performance Work Statement for refuse dipsosal and recycl

Updated

A PDF document (165 KB) attached to FLETC Cheltenham Integrated Solid Waste/Recycle Disposal, from the Federal Law Enforcement Training Center. Due Nov 13, 2026, 2:00 PM (UTC-5).

File name: Performance Work Statement for refuse dipsosal and recycl 11-3-26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Performance Work Statement for
Solid Waste Disposal and Recycling

February 27, 2026

Performance Work Statement for
Solid Waste Disposal and Recycling
Description of Services and General Information
1.0 Scope: The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other necessary items to perform non-hazardous integrated solid waste and recycling disposal at the Federal Law Enforcement Training Center (FLETC), located at 9000 Commo Rd. Cheltenham, Maryland 20588. Performance shall be in accordance with all applicable state and federal laws, regulations, standards, instructions, general practices, and requirements to meet the goals of this Performance Work Statement (PWS). 1.1. Hours of Operation: 7am to 4pm Monday through Friday, except in case of severe weather, when the contractor cannot make it on site. The contractor will notify the Contracting Officer Representative (COR) when unable to service the site on the designated pick-up dates. In such cases, the dumpsters will be serviced the following business day. The Federal Government will be closed on the following federal holidays.
New Year’s Day

Jan 1

Martin Luther King Day

Third Monday of January

President’s Day

Third Monday of February

Memorial Day

Last Monday of May

Juneteenth

June 19

Independence Day

July 4

Labor Day

First Monday in September

Columbus Day
(Indigenous People Day)
Veteran’s Day

Second Monday in October

Thanksgiving Day

Fourth Thursday in November

Christmas Day

November 11

December 25

Integrated Solid Waste/Recycle Disposal
1.2. The contractor shall provide dumpsters, equipment, vehicles, materials, and labor to dispose of non-hazardous solid waste and recyclable materials accumulated on site. The contractor shall empty the waste and recycling dumpsters once a week to prevent their capacity from being exceeded and to maintain the dumpsters in a sanitary condition, free of dirt, debris, and odor, in accordance with local commercial practices and Environmental Safety and Occupational Health (ESOH) regulations and guidance provided at www.osha.gov. When a dumpster needs to be moved or relocated, the contractor will do so at the COR's request. When a request to move or relocate a dumpster is essential and cannot wait until the next service date, the contractor must move or relocate the dumpster within 24 hours of notification. 1.2.1 The contractor will keep all equipment, vehicles, and dumpsters in operational order throughout the contract. All dumpster doors, tops, or damage to the dumpster body, including

The beginning of the document. Download the full file to read on.

Other documents in this bid