Plans 438-21-403 Renovate 1st Floor Kitchen Part5
Updated
A PDF document (8.7 MB) attached to PN: 438-21-403, Renovate First Floor Kitchen (SF), from the Department of Veterans Affairs. Due Nov 4, 2026, 1:00 PM (UTC-6).
File name: Plans 438-21-403 Renovate 1st Floor Kitchen_Part5.pdf
The full file is for paid members, or buy this bid alone.
Preview
6"
three inches = one foot
A
one and one half inches = one foot
6"
A
FRZ.
204B
A
207C
207B
207A
B
COFFEE,
VENDING &
CATERING
STORAGE
FLOOR
DRAIN W/
FUNNEL
HOT FOOD
PREP
B
222B
A
222A
B FD
B
REF.
205B
FSH
one inch = one foot
6"
A
DRY STORAGE
L1
181A
R1
FD
RETAIL
C
C
three quarters inch = one foot
6"
C
GRAB
& GO
ELEV.
276 275B 275C
D
D
D
DINING
TRASH /
RECYCLING
HOLDING
one half inch = one foot
RECEIVING
8/17/2026 5:13:13 PM
141A
VENDING
C10
E
E
HALLWAY
BIO-HAZARD
COOLER
F
\\RIPPE\Project\Sioux Falls VA Phase 4-5 26.023.00\20.148.00-FS EQP CENTRAL 2025.rvt
one eighth inch = one foot
one quarter inch = one foot
three eighths inch = one foot
E
2B
199A
F
FD W/
FUNNEL
NORTH
KEYPLAN
1 FOODSERVICE MECHANICAL PLAN - VCS KITCHEN
1/4" = 1'-0"
NTS
CONSULTANTS
CIVIL:
Revision#
ISSUE SET
Description
VA FORM 08 - 6231
Ulteig Engineers, Inc.
5701South Corporate Place
Sioux Falls, SD 57108
Phone: 605-323-2306
08-18-2026
Date:
ARCHITECT OF RECORD
STRUCTURAL:
MEP:
Dunham Asssociates, Inc.
50 South Sixth St
Suite 1100
Minneapolis, MN 55402
Phone: 612-465-7550
Ericksen Roed Associates
2550 University Ave W
Suite 423-S
St. Paul, MN 55402
Phone: 651-251-7570
Drawing Title
STAMP
Office of
Construction
and Facilities
Management
FOOD SERVICE:
Rippe Associates
3600 American Boulevard W
Suite 315
Minneapolis, MN 55413
Phone: 952-933-0313
Stone Group Architects, Inc.
600 East 7th Street
Sioux Falls, SD 57103
Phone: 605-271-1144
Phase
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER
FOODSERVICE EQUIPMENT
MECHANICAL PLAN - VCS
Approved:
Location
Project Number
VA #438-21-403
SGA #201956
Building Number
Drawing Number
SIOUX FALLS, SOUTH DAKOTA
U.S. Department
of Veterans Affairs
Project Title
Issue Date
Checked
Drawn
8-18-2026
JA
ZS
FSM103
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Statement of Work 438-21-403 Renovate First Floor for New Kitchen
- Plans 438-21-403 Renovate 1st Floor Kitchen Part1
- Plans 438-21-403 Renovate 1st Floor Kitchen Part2
- Plans 438-21-403 Renovate 1st Floor Kitchen Part3
- Plans 438-21-403 Renovate 1st Floor Kitchen Part4
- Safety or Environmental Violations and EMR Information
- Specifications Vol 1 2026-08-18
- Specifications Vol 2 2026-08-18
- VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance
- VHA.3 Jan 3 2025
- Bid document