Pre-Solicitation SAM Notice

Updated

A PDF document (89 KB) attached to Jennifer Brown (COW), from the Indian Health Service. Due Oct 30, 2026, 2:00 PM (UTC-5).

File name: A11 Pre-Solicitation SAM Notice.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

This is a PRE-SOLICITATION NOTICE. Solicitation 75H70126Q00036 will include for the installation of replacement individual septic system for an existing home on fee land in Clark County, WA. This project will be procured as a Total Small Business Set-Aside solicitation under North American Industry Classification System (NAICS) code 237110 Water and Sewer Line and Related Structures Construction with a size standard of $45 million. The offeror must be a Small Business to be eligible for award. The Government anticipates releasing the solicitation on or about 1 October 2026 timeframe with quotes due at least 30 calendar days after solicitation issuance. This date is subject to change. A full scope of work plans and specifications and Davis Bacon Wage Determination will be included in the solicitation documents. Hard copy documents will NOT be available – all documents for proposal purposes will be posted at www.sam.gov for download by interested parties.
SCOPE OF WORK: This project is for the installation of a replacement individual septic system for an existing home on fee land in Clark County, WA.
The contractor shall install 4” solid sewer pipe; an underground two-way cleanout; a 1,500-gallon concrete twocompartment septic tank with filter; a 1,050-gallon concrete dosing tank with one dosing effluent pump, pump vault and controls; auto flush headworks; 2” effluent supply and return line; subsurface drip system drainfield with 2” manifold and vacuum relief valve per County-approved design; pump and dispose of existing septic tank offsite. Further investigation of the site is the responsibility of the Contractor. Location of utilities are the responsibility of the Contractor. All electrical work is the responsibility of the Contractor and must be completed by an Electrician licensed in Washington State. All County permits and fees are the responsibility of the Contractor. Vegetative clearing is the responsibility of the Contractor, including brush and small-diameter trees. Homeowners will remove non-vegetative debris from construction area prior to construction. TERO: TERO fees do NOT apply.
CONSTRUCTION DURATION: Period of Performance is 30 calendar days after issuance of a Notice to Proceed. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $25,000 and $100,000.
SITE VISIT: A formal site visit is not planned. Please see Section L and contact homeowner directly should one be desired. Information on how to visit the site will be provided within the official solicitation under FAR 52.236-2.