Prelim Letter ID ERFO FS 2022-1
Updated
A PDF document (220 KB) attached to ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1, from the Federal Highway Administration.
File name: Prelim Letter_ID ERFO FS 2022-1(1).pdf
The full file is for paid members, or buy this bid alone.
Preview
Western Federal Lands Highway Division
610 E. Fifth Street
Vancouver, WA 98661
Phone 360-619-7700
Fax 360-619-7846
October 7, 2026
NOTICE TO PROSPECTIVE BIDDERS
RE:
ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1 Solicitation No. 69056726B000016
The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After November 1, access will be weather dependent; contact the Nez Perce – Clearwater National Forest for current road conditions at https://www.fs.usda.gov/r01/nezperce-clearwater or 208-935-2513. No Federal Highway Administration personnel will be available for show-me tours. One Bid Schedules - The work will be solicited under one bid schedule. See the “Project Description” document on SAM.gov under Attachments for additional details. Project Location and Type of Work - All project work is in the Nez Perce-Clearwater National Forest
1) Site 5295, MP 1.15: 46°44'34.24"N, 115°18'54.39"W (Clearwater County). Road failure due to excessive spring runoff resulting in over saturation of the roadway fill slope. Repair consists of restoring embankment with mechanically stabilized earth (MSE) on top of a special rock embankment (SRE), reestablishing roadway typical section, aggregate resurfacing, grading and drainage repair.
2) Site 317, MP 2.1: 46° 8'12.77"N, 115°34'47.14"W (Idaho County). Road failure due to excessive spring runoff resulting in over saturation of the roadway fill slope. Repair consists of restoring embankment with deep patch repair, reestablishing roadway typical section, aggregate resurfacing, grading and drainage repair including the replacement of a cross drain and adding riprap protection.
3) Site 648, MP 16.6: 45°51'40.32"N, 115°48'28.66"W (Idaho County). Road failure due to excessive spring runoff resulting in over saturation of the roadway fill slope. Repair consists of restoring embankment with MSE wall, reestablishing roadway typical section, aggregate resurfacing, grading and drainage repair including the replacement of a cross drain and adding riprap protection.
Preliminary Plans Letter
Project: ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1 4) Site 354, MP 13.3: 45°37'34.36"N, 116° 3'22.14"W (Idaho County). Roadway failure due
The beginning of the document. Download the full file to read on.