PROJECT DESCRIPTION ID ERFO FS 2022-1

Updated

A PDF document (191 KB) attached to ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1, from the Federal Highway Administration.

File name: PROJECT DESCRIPTION_ID ERFO FS 2022-1(1).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1 Nez Perce-Clearwater National Forest
Clearwater and Idaho Counties, Idaho
The work consists of culvert replacement, wall construction, and slope repairs. The project consists of five locations within the Nez Perce-Clearwater National Forest. Project length: 0.2 miles
Tentative Fixed Completion Date: Fall 2027
(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.) Tentative Solicitation Date: Winter 2026/2027
Estimated Price Range: $2,000,000 and $5,000,000
Location: 15 miles SE of Grangeville, ID

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-24
Base Schedule

DIVISION 150 – Project Requirements
151 Mobilization
152 Construction Survey & Staking (yes/no)
153 Contractor Quality Control and Assurance
154 Contractor Sampling & Testing (yes/no)
155 Schedules for Construction Contracts (construction schedules) 157 Soil Erosion & Sediment Control (erosion control devices)

Yes
Yes
(yes/no)
(yes/no)

Yes
Yes
Yes

200 LNFT

DIVISION 200 – Earthwork
201 Clearing & Grubbing
204 Roadway Excavation
204 Subexcavation
204 Select Borrow
207 Separation Geotextile, Woven
207 Geogrid, Standard

2200 SQYD

5100 CUYD

400 CUYD

380 CUYD

710 SQYD

950 SQYD

DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Placed Riprap, Class 3
252 Special Rock Embankment, Mechanically placed
255 Mechanically Stabilized Earth Walls

72 CUYD

1000 CUYD

4200 SQFT

Base Schedule

DIVISION 300 – Aggregate and Base Courses
301 Aggregate Surface Course
302 Roadway Aggregate, Method 2
314 Stockpiled Aggregates – Bentonite

700 CUYD

670 CUYD

2 TON

DIVISION 600 – Incidental Construction
602 24-inch pipe Culverts
602 72-inch pipe Culverts
622 Dump Truck
622 Hydraulic Excavator
622 Chain Saw
622 General Labor
625 Turf Establishment
628 Temporary Stream Diversion
635 Temporary Traffic Control, Traffic Control Supervisor 635 Temporary Traffic Control, Barricade Type 3
635 Temporary Traffic Control, Construction Sign
635 Temporary Traffic Control, Flagger
635 Temporary Traffic Control, Pilot Car

125 LNFT

50 LNFT

40 HOUR

40 HOUR

40 HOUR

40 HOUR

2550 SQYD

LPSM

LPSM

10 EACH

500 SQFT

100 HOUR

10 DAY