Home / 528A8-22-814 Consolidate Primary Care Reception / Document

Primary Care 1A - ISSUE FOR BID Specifications VOL 1

Updated

A PDF document (2.5 MB) attached to 528A8-22-814 Consolidate Primary Care Reception, from the Department of Veterans Affairs. Due Dec 8, 2026, 11:00 AM (UTC-5).

File name: 528A8-22-814 Primary Care 1A - ISSUE FOR BID Specs VOL 1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ISSUE FOR BID

SPECIFICATIONS VOL1

DIVISIONS 1-13

CONSOLIDATE PRIMARY CARE 1ST FLOOR PHASE 1A

AT

SAMUEL S STRATTON VA MEDICAL CENTER

PREPARED FOR

DEPARTMENT OF VETERANS AFFAIRS

20 MADISON AVE EXT, ALBANY, NY 12203

28 October 2026

Project No.: 528A8-22-814

PREPARED BY

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET, HOPEWELL, NJ 08525

PH: 855.821.0274 I ThinkFormArchitects.com

WATSON ENGINEERS, PC

1112 STATE ROUTE 434, OWEGO, NY 13827

PH: 607.223.4334 I Watson-Engineer.com
MABBETT & ASSOCIATES, INC.

105 CENTRAL STREET, SUITE 4100, STONEHAM, MA 02180

PH: 781.275.6050 I Mabbett.com

Consolidate Primary Care 1ST Floor
Phase 1A, VAMC Albany, NY

PROJECT NO.: 528A8-22-814

10-01-2026
Issue for Bid

28 October 2026

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10
SECTION NO.

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15

List of Drawing Sheets

05-20

01 00 00

01 32 00

01 32 16.15

01 33 23

01 35 26

01 42 19

01 45 00

01 57 19

01 58 16

01 74 19

01 81 13

01 91 00

DIVISION 01 - GENERAL REQUIREMENTS

General Requirements
Construction Documentation
Project Schedules (Small Projects – Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Temporary Environmental Controls
Temporary Interior Signage
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements

06-26
09-23
09-26
03-26
05-24
11-20
02-21
01-21
07-15
04-22
10-17
04-22

02 41 00

02 82 11

02 83 33.13

DIVISION 02 – EXISTING CONDITIONS

Demolition
Traditional Asbestos Abatement
Lead-Based Paint Removal and Disposal

08-17
01-21
01-21

06 10 00

06 20 00

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

Rough Carpentry
Finish Carpentry

10-17
01-21

07 81 00

07 84 00

07 92 00

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Applied Fireproofing
Firestopping
Joint Sealants

07-23
01-21
04-22

08 11 13

08 14 00

08 31 13

08 56 59

08 71 00

08 71 13.11

08 80 00

DIVISION 08 - OPENINGS

Hollow Metal Doors and Frames
Interior Wood Doors
Access Door and Frames
Service and Teller Window Units
Door Hardware
Low Energy Power Assist Door Operators
Glazing

01-21
01-21
06-25
01-21
03-24
01-21
01-21

09 05 16

09 06 00

DIVISION 09 – FINISHES

Subsurface Preparation for Floor Finishes
Schedule for Finishes

02-26
01-21

00 01 10-1

Consolidate Primary Care 1ST Floor
Phase 1A, VAMC Albany, NY

PROJECT NO.: 528A8-22-814

SECTION NO.

10-01-2026

The beginning of the document. Download the full file to read on.

Other documents in this bid