Primary Care 1A - ISSUE FOR BID Specifications VOL 2
Updated
A PDF document (3.2 MB) attached to 528A8-22-814 Consolidate Primary Care Reception, from the Department of Veterans Affairs. Due Dec 8, 2026, 11:00 AM (UTC-5).
File name: 528A8-22-814 Primary Care 1A - ISSUE FOR BID Specs VOL 2.pdf
The full file is for paid members, or buy this bid alone.
Preview
ISSUE FOR BID
SPECIFICATIONS VOL 2
DIVISIONS 21-28
CONSOLIDATE PRIMARY CARE 1ST FLOOR PHASE 1A
AT
SAMUEL S STRATTON VA MEDICAL CENTER
PREPARED FOR
DEPARTMENT OF VETERANS AFFAIRS
20 MADISON AVE EXT, ALBANY, NY 12203
28 October 2026
Project No.: 528A8-22-814
PREPARED BY
THINKFORM DESIGN ARCHITECT LLC
38 EAST BROAD STREET, HOPEWELL, NJ 08525
PH: 855.821.0274 I ThinkFormArchitects.com
WATSON ENGINEERS, PC
1112 STATE ROUTE 434, OWEGO, NY 13827
PH: 607.223.4334 I Watson-Engineer.com
MABBETT & ASSOCIATES, INC.
105 CENTRAL STREET, SUITE 4100, STONEHAM, MA 02180
PH: 781.275.6050 I Mabbett.com
Consolidate Primary Care 1ST Floor
Phase 1A, VAMC Albany, NY
PROJECT NO.: 528A8-22-814
10-01-2026
Issue for Bid
28 October 2026
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO.
DIVISION AND SECTION TITLES
DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15
List of Drawing Sheets
05-20
01 00 00
01 32 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 57 19
01 58 16
01 74 19
01 81 13
01 91 00
DIVISION 01 - GENERAL REQUIREMENTS
General Requirements
Construction Documentation
Project Schedules (Small Projects – Design/Bid/Build)
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Temporary Environmental Controls
Temporary Interior Signage
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements
06-26
09-23
09-26
03-26
05-24
11-20
02-21
01-21
07-15
04-22
10-17
04-22
02 41 00
02 82 11
02 83 33.13
DIVISION 02 – EXISTING CONDITIONS
Demolition
Traditional Asbestos Abatement
Lead-Based Paint Removal and Disposal
08-17
01-21
01-21
06 10 00
06 20 00
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
Rough Carpentry
Finish Carpentry
10-17
01-21
07 81 00
07 84 00
07 92 00
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Applied Fireproofing
Firestopping
Joint Sealants
07-23
01-21
04-22
08 11 13
08 14 00
08 31 13
08 56 59
08 71 00
08 71 13.11
08 80 00
DIVISION 08 - OPENINGS
Hollow Metal Doors and Frames
Interior Wood Doors
Access Door and Frames
Service and Teller Window Units
Door Hardware
Low Energy Power Assist Door Operators
Glazing
01-21
01-21
06-25
01-21
03-24
01-21
01-21
09 05 16
09 06 00
DIVISION 09 – FINISHES
Subsurface Preparation for Floor Finishes
Schedule for Finishes
02-26
01-21
00 01 10-1
Consolidate Primary Care 1ST Floor
Phase 1A, VAMC Albany, NY
PROJECT NO.: 528A8-22-814
SECTION NO.
10-01-2026
The beginning of the document. Download the full file to read on.