OR FS FREWN602 28(1), Road 28 Reconstruction
Lake County, Oregon
This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
•
•
•
•
Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches.
Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027
Tentative Fixed Completion Date:
•
•
•
•
Base: July 2027
Option X: July 2027
Option Y: September 2027
Option Z: August 2027
DESCRIPTION OF WORK in US CUSTOMARY UNITS
DIVISION 150 – Project Requirements
152 Construction Survey & Staking
(yes/no)
Yes
Yes
Option
Option
Option
Sch Name
_
USING FP-24 SPECS
Option
Option
Option
Sch Name
_
153 Contractor Quality Control and
Assurance
(yes/no)
Yes
Yes
154 Contractor Sampling & Testing
(yes/no)
Yes
Yes
155 Schedules for Construction Contracts
(construction schedules)
(yes/no)
Yes
Yes
157 Soil Erosion & Sediment Control
(Fiber Roll)
158 Watering for dust control
200 LNFT
LPSM
LPSM
LPSM
LPSM
4 each
16 each
5 each
DIVISION 200 – Earthwork
203 Removal of Sign
17 Each
204 Subexcavation
580 CUYD
204 Select Borrow
1130 CUYD
DIVISION 250 – Slope
Reinforcement and Retaining Walls
251 placed Riprap, class 2
15 CUYD
DIVISION 300 – Aggregate and
Base Courses
302 Roadway Agg
30402-5200 Full depth reclamation,
method 2, 4-inch depth
31103-3000 Stabilized aggregate surface
course, calcium chloride
135 Ton
20 Ton
107000
SQYD
35700
SQYD
110 TON
87500
SQYD
21300 TON
26400 TON 9100 TON
155 TON
Option
Option
450 TON
Option
Sch Name
_
31110-0000 calcium chloride
360 TON
DIVISION 400 – Asphalt pavements
and surface treatments
418 Asphalt Concrete pavement patch,
type 2
730 SQYD
DIVISION 550 – Bridge Construction
579 Minor Bridge Work
LPSM
Division 600 – Incidental Construction
622 – Rental Equipment
Yes
Yes
Yes
Yes
623 – General Labor
Yes
Yes
Yes
Yes
633 – Sign System
106 SQFT
50 SQFT
89 SQFT
67 SQFT
LPSM
LPSM
LPSM
LPSM
600 HR
120 HR
635 – Temporary Traffic Control,
(Devices)
635 – Temporary Traffic Control, Traffic
Control Supervisor
LPSM
LPSM
635 – Temporary Traffic Control, Flagger
LPSM
LPSM