OR FS FREWN602 28(1), Road 28 Reconstruction
Lake County, Oregon

This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
•
•
•
•

Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches.

Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027
Tentative Fixed Completion Date:
•
•
•
•

Base: July 2027
Option X: July 2027
Option Y: September 2027
Option Z: August 2027

DESCRIPTION OF WORK in US CUSTOMARY UNITS

DIVISION 150 – Project Requirements
152 Construction Survey & Staking
(yes/no)

Yes

Yes

Option

Option

Option

Sch Name
_

USING FP-24 SPECS

Option

Option

Option

Sch Name
_

153 Contractor Quality Control and
Assurance
(yes/no)

Yes

Yes

154 Contractor Sampling & Testing
(yes/no)

Yes

Yes

155 Schedules for Construction Contracts
(construction schedules)
(yes/no)

Yes

Yes

157 Soil Erosion & Sediment Control
(Fiber Roll)
158 Watering for dust control

200 LNFT

LPSM

LPSM

LPSM

LPSM

4 each

16 each

5 each

DIVISION 200 – Earthwork
203 Removal of Sign

17 Each

204 Subexcavation

580 CUYD

204 Select Borrow

1130 CUYD

DIVISION 250 – Slope
Reinforcement and Retaining Walls
251 placed Riprap, class 2

15 CUYD

DIVISION 300 – Aggregate and
Base Courses
302 Roadway Agg
30402-5200 Full depth reclamation,
method 2, 4-inch depth
31103-3000 Stabilized aggregate surface
course, calcium chloride

135 Ton

20 Ton

107000

SQYD

35700

SQYD

110 TON
87500

SQYD

21300 TON

26400 TON 9100 TON

155 TON

Option

Option

450 TON

Option

Sch Name
_

31110-0000 calcium chloride

360 TON

DIVISION 400 – Asphalt pavements
and surface treatments
418 Asphalt Concrete pavement patch,
type 2

730 SQYD

DIVISION 550 – Bridge Construction
579 Minor Bridge Work

LPSM

Division 600 – Incidental Construction
622 – Rental Equipment

Yes

Yes

Yes

Yes

623 – General Labor

Yes

Yes

Yes

Yes

633 – Sign System

106 SQFT

50 SQFT

89 SQFT

67 SQFT

LPSM

LPSM

LPSM

LPSM

600 HR

120 HR

635 – Temporary Traffic Control,
(Devices)
635 – Temporary Traffic Control, Traffic
Control Supervisor

LPSM

LPSM

635 – Temporary Traffic Control, Flagger

LPSM

LPSM