Question and Answers:
Below is a list of question and answers based on questions submitted prior to the deadline. 1. Could you please confirm whether Daikin would be accepted as an alternative
manufacturer, provided the proposed equipment meets or exceeds. Yes ,as long as the equipment meets or exceeds.
2. Section 3 specifies regular business hours, while Section 7 specifies Friday– Sunday evenings with completion by Sunday noon. What are the permitted work hours, and must installation be completed within one weekend? Per the specification language you shared, non-intrusive work may occur during regular business hours. All intrusive, noise-producing, or system-down activities must be scheduled Friday evening through Sunday at noon, with the system fully operational by Sunday at 12:00 PM. Major installation activities should be planned for completion within that window unless otherwise approved. 3. Please provide available photos or layouts showing equipment locations, piping routes, approximate line-set lengths, and electrical connections. Vendors may request a brief walkthrough if additional field verification is needed. 4. Are existing condensate drains available for reuse, or is new drainage required? Existing condensate drains may be reused if they meet slope, capacity, and code requirements. Where reuse is not feasible, vendors should plan to install new code-compliant drainage dedicated to the VRF indoor units. 5. What controls are required, including any integration with the existing building automation system? No, because the units are not direct patient care. 6. Who is responsible for the one-year workmanship warranty identified as manufacturer-provided? Vendors must install equipment in accordance with manufacturer standards to activate the manufacturer’s workmanship warranty. In addition, vendors should provide a one-year labor warranty covering installation-related defects not attributable to the manufacturer. 7. Are the specified Mitsubishi/Trane makes and models mandatory, or will equivalent equipment be accepted? Mitsubishi and Trane units are the basis of design. Equivalent VRF systems from other major manufacturers will be considered if they meet or exceed the required performance and include full technical comparisons demonstrating equivalency.
8. Please confirm whether the four TPKFYP008LM1M0A units require 8,000 or 9,000 BTU cooling capacity. Unless otherwise specified in the final construction documents, vendors should plan for a 9,000 BTU cooling capacity for these units.