Question: Is a submission based on both AOI1 & AOI2 mandatory or is it possible to submit only based on 1 AOI?
Answer: It is possible to submit based on only one area of interest.
Question: Do projects on both AOI’s start in parallel or there is a sequence? Answer: Multiple rolling awards in parallel are anticipated.
Question: Aside from reports and KPP’s deriving from the actual development work, what exactly are the end deliverables expected here? Meaning, are there certain HW, SW or production of physical components at a certain quantity (e.g end parts) or dedicated capacity as service for X period that are supposed to be part of the scope or is the procurement out of scope?
Answer: Requirements to address this question cannot be shared in the public domain.
Question: Is the goal of AOI2 for vendors to provide Manufacturing as Service to the DoW or to Primes that support DoW?
Answer: The MaaS approach should be tested with Primes.
Question: In the same sense, is the expectation here to provide solutions for MAAS of the fully vertically integrated product (e.g fully functional UAS) or components (e.g Airframes for UAS)?
Answer: The goal is to demonstrate the use of MaaS approaches for a fully integrated weapon system.
Question: If a fully vertical integrated product is expected as the end deliverable, are partnerships with Primes acceptable as form of proposal (for example, company A does the Airframes and Prime A handles the avionics, engine, etc)?
Answer: Yes
Question: For AOI2 and the 4 sample programs listed, is the expectation to onboard a DoW sponsor (e.g the program office of the end application/weapon program) to support this effort (e.g “Note that even with a partnership with an active program, there needs to be a joint willingness between proposer team to incorporate EF manufacturing technology into overall program”)?
Answer: Yes
Question: Do you have any more information / articles about the goals of Endless Forge and what it is working to achieve?
Answer: Attend Industry Day 1.0 for more information. More details to come.
Question: Is schedule optimization being considered as a component in the Endless Forge Solicitation?
Answer: EF will offer the DAF the ability to scale any weapon system at speed through a platform-agnostic approach that can respond to battlefield performance.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 6: Articles
- Attachment 1: Endless Forge AOIs
- Attachment 10: Security Program Questionnaire
- Attachment 11: AFRL Privacy Act for Covered Individuals Fillable
- Attachment 12: Representations and Certifications - FAR Contract
- Attachment 13: Contract Data Requirements List DD Form 1423-1 Endless Forge
- Attachment 2: Statement of Work Supplemental Requirements
- Attachment 3: AFRL ANSI NISO Based Guide to Formatting Tech Reports
- Attachment 4: SF298
- Attachment 7: Solicitation Language for Security Risk Review AFRLI 61-113
- Attachment 9: Research and Related Senior and Key Person Profile Worksheet
- Open Period Solicitation for Endless Forge