Project No.
Project

WA NP OLYM 12(8)

Hurricane Ridge Rockfall Mitigation MP 9.4

Check General or Technical

#

General Technical

Question

Answer

Date

I cannot find the geotechnical report. Can you
send that to me?

The Final Geotechnical report, olym128_GEO_11-24.pdf, is available in the zipped Physical Data file [Physical Data_WA NP
OLYM 12(8).zip] posted under
"Attachments" on SAM.gov

10/16/26

X

I was wondering if you have a list of potential
bidders for this project?

The Government does not provide this
since bidders may obtain the registered
vendors list (aka planholders list) from
sam.gov after linking their entity to their
registration. If you are signed into SAM.gov
with your registered entity and you cannot
see the Interested Vendors List, you will
need to be assigned the Contract
Opportunities Administrator role for your
entity in SAM.gov.Go to
https://www.fsd.gov/gsafsd_sp if you need
additional assistance.

10/26/26

X

The Government does not provide this
since bidders may obtain the registered
We saw the Hurricane Ridge Rockfall Mitigation vendors list (aka planholders list) from MP 9.4 project on SAM.gov, but were unable to sam.gov after linking their entity to their locate a list of potential planholders or
registration. If you are signed into SAM.gov
prospective general bidders.
with your registered entity and you cannot
see the Interested Vendors List, you will
Could you please provide a list of general
need to be assigned the Contract
contractors who intend to bid on this project so Opportunities Administrator role for your we can submit our proposal to them?
entity in SAM.gov.Go to
https://www.fsd.gov/gsafsd_sp if you need
additional assistance.

10/27/26

X

Can you please indicate what bid line item the
Refer to Subsections 269.05, 262.06, and
safety scaling and hazard tree removal from the
262.09.
chute will be paid under?

10/28/26

X

Will you also confirm if FHWA will allow
sacrificial steel and galvanization for the double Bid according to the project plans and corrosion protection of the soil nails? Instead of specifications. the solid bar depicted in the plans.

10/28/26

X

X

Could FHWA please provide or identify the
relevant drawings showing the intended MRB
location and relationship to the temporary
concrete traffic barriers? We have been unable
to identify these details on the drawings
provided.

X

Would FHWA accept an alternative engineered
temporary rockfall barrier system in lieu of the