Questions and Answers
Updated
A PDF document (433 KB) attached to GAOA Grizzly Bear Campground, from the Forest Service. Due Nov 20, 2026, 12:00 PM (UTC-8).
File name: Questions and Answers 9 Nov 26.pdf
The full file is for paid members, or buy this bid alone.
Preview
Questions and Answers
GAOA Grizzly Bear Campground
9 November 2026
General
1. Will the Government issue an updated Schedule of Items and revised drawings identifying the final base-bid and optional-item requirements? Yes. Amended drawings and specifications will be issued.
2. Please confirm that the existing Schedule of Items is to remain unchanged unless a revised version is formally issued. Schedule of items will remain unchanged. 3. Please identify the applicable base or optional bid item for each improvement. There are no optional bid items.
4. Please identify the approved contractor staging areas and confirm whether construction trailers, storage containers, material stockpiles, and equipment parking will be permitted within the closed campground.
5. The campground will be closed during construction. The Contractor will be allowed to stage equipment and materials within the closed campground as per section 010150.1.7 and 010150.1.14
6. Please confirm that the contractor must provide all temporary construction water and sanitation facilities for the duration of the project. As per section 010150.1.6. The contractor will be allowed to place porta potties on the site. Use of existing toilets is not permitted.
7. Please identify any restrictions on temporary water storage, water hauling, or portable sanitation placement. There are no restrictions on the placement of portable sanitation or temporary water storage and hauling. Refer to section 010150.1.14. 8. Please confirm whether there are any project-specific bridge load limits, equipment restrictions, or requirements for temporary protection when transporting construction equipment and materials into the campground. There are no restrictions on legal loads. LRFR Load ratings for the bridge is: Type 3 vehicle – 43.73 Ton 1. Type 3S2 vehicle – 65.04 Ton
2. Type 3-3 vehicle – 86.38 Ton
9. Please provide any required minimum equipment setbacks, protective fencing limits, vibration restrictions, or monitoring requirements associated with these historic features.Protection Areas are covered under section 010150.1.10 10. Please confirm whether a historic-resource protection plan is required before construction. A historic-resource protection plan is not required. 11. Please confirm whether any revised drawings, specifications, or addenda have been issued since the May 28, 2025, 100% construction document set.Revised plan sheets will be issued by addenda.
12. Will the Government issue written responses to the questions discussed during the site
The beginning of the document. Download the full file to read on.