GAOA – Grizzly Bear Campground Reconstruction
Revision Log

Specifications
Sheet 37
Section 010250.3.2.L.1 L.

Base Item No. 12 – Host Site Wastewater Connections and Tank

The statement below has been added to this section.
This item includes all installation components including but not limited to excavation and trenching, bedding material, fill, backfill, compaction, providing and placing the vault and sewage lines, and providing alarms and all electrical lines and connections for complete operation.

Sheet 39
Section 010250.3.2.N.1 – Delete the term “option”.

Sheet 90
Section 006200.2.06.A – Double Unit Toilet: 5/4 x 8 Cedar Lap Siding

Sheet 146
Section 260500.2.14.A.3 Delete TV/Telephone

Sheet 151
Section 262210.1.D.1 Payment to Power Company changed to the following Where work is to be performed by the power company that requires payment to the power company, payment will be made by the Contractor. Work to be performed by the power company is defined as "By Utility".

Sheet 152
Section 2662210.2.1.A – Service Conductors
A. From Transformer to Service Entrance: Provided and installed by. the Contractor.

Sheet 187-191

Section 321217 – Hot Mix Asphalt Paving has been removed.

Plan Drawings

Sheet A1.1 Double Toilet Floor Plan, Elevations, Misc
Removed the term “option” on installing windows and staining existing toilets

Sheet G1.0 Title Sheet
Sheet C7.0 Bid Option Plan has been removed from the sheet index.

Sheet MD1.1 Mechanical/Plumbing Site Demolition Plan
Verified location of demo septic vault.

Sheet M6.0 Mechanical/Plumbing Site Plan
Removed 3 instances of the term “option” from table.

Sheet M6.1 Mechanical Details New Sewage Vault
Removed the term “optional” from title block and detail D.

Sheet ED1.1 Electrical Site Plan Demolition Plan
Demolition Keynotes 5 – Demo existing pedestal and replace with new.

Sheet E5.0 Electrical Details One-Line Diagram
Panel L1 – 22K AIC Panelboard

Sheet E5.1 Electrical Details Pump House Electrical Layout Mount new pump motor minder.