Home / 500-Ton Trailer-Mounted Air-Cooled Chiller / Document

Questions and Responses to Chiller Request for Quotations Amendment 3

Updated

A PDF document (131 KB) attached to 500-Ton Trailer-Mounted Air-Cooled Chiller, from the National Aeronautics and Space Administration. Due Oct 30, 2026, 4:00 PM (UTC-4).

File name: 80KSC026R0023 Questions and Responses to Chiller RFQ Amendment 3 10-22-26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

80KSC026R0023 Questions and Responses 10-26-2026

Question
#

RFQ Area

Section

Requirement/
Paragraph #

Page #

Attachment J-01
SOW

2.0 Scope of Work

Will NASA/KSC personnel or the Contractor physically connect the Contractor-furnished 480-volt power cables to existing facility electrical interfaces? Please confirm who will perform facility-side isolation and Attachment J-01, Statement of Work (SOW) was revised for clarity. See energization, and whether KSC will make the required electrical power available for scheduled startup SOW Revision released with Amendment 3.
and testing.

Attachment J-01
SOW

2.0 Scope of Work

Will NASA/KSC personnel or the Contractor physically connect the Contractor-furnished six-inch chilledwater supply and return hoses to existing facility flanges? Please confirm who will perform facility-side Attachment J-01, Statement of Work (SOW) was revised for clarity. See valve isolation, filling and venting, as applicable, and whether KSC will make the existing chilled-water SOW Revision released with Amendment 3. system water-filled and operational for scheduled startup and performance verification.

The configuration for this unit requires a trailer that exceeds the 55' length maximum in your SOW. We are recommending a 60' trailer to accommodate the chiller with the pump skid mounted on the upper deck. Is this acceptable, or do I need to work with engineering to see if the 55' max length is something they can make work? The chiller unit itself is 49.5' so a 50' lower deck is absolutely necessary to house the chiller, and the upper deck platform can only be so short with swing clearance taken into consideration. Please advise and I can upload a revised response to the solicitation.

Attachment J-01, Statement of Work (SOW) was revised for clarity. See SOW Revision released with Amendment 3.

Attachment J-01, Statement of Work (SOW) was revised for clarity. See SOW Revision released with Amendment 3.

Question

Gov Response

Attachment J-01

3.0 Technical Requirements

SOW

3.2 Trailer a.

Attachment J-01

3.0 Technical Requirements

SOW

3.1 Chiller

Figure 1.
Figure 2.

Electrical connection – Section 3.1(c) (p.1) lists two 480 V, 125 A cable sets. The PHSF drawing in Section 6.0 (p.4) shows 100 A and 60 A receptacles at the portable chiller location (outside Rm 1016), and a 200 A receptacle highlighted outside Rm 1023. Could you let us know which receptacle(s) the chiller and pump should connect to, and the plug or termination type, so our cables match the facility?

The beginning of the document. Download the full file to read on.