RFI’s for WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
RFI No.
Location
SF 1442
Blocks 9 and
13a; Section L
1.6; Sections E
and F
SOW header;
Drawings G101 thru A-201
Section L
2.2.1–2.2.4,
2.3, 3.2(b)(1),
3.7; Section M
2.2–2.3; SOW
3.5
SF 1442 Block
10; SOW 1.1;
S-101, S-102,
AD-101 and
A-101
keynotes
S-101 and S102 keynotes;
S-501
Issue
Block 13a requires sealed hardcopy offers; Section L 1.6 allows email. Block 9 lists the PCO
phone as 555-555-5555. The
COR is listed as James Potter
with email
[email protected]
The SOW and all drawings are
issued at 35% design.
Sections L and M reference
SOW 3.12, 3.12.5.1, 3.12.6,
3.6.1 and 3.6.2, including a
Design Program Manager,
design-build responsibility and a
design price breakout under
DFARS 236.606-70. These
sections are not in the SOW.
SOW 3.5 requires only
Contractor shop drawings.
The SOW describes repair of the
east post, Post 34. The drawings
show replacement of multiple
5x5 posts at the north end wall
and the open east side, each with
a new 24"x24"x4'-0" footing. No
quantity is given.
Keynotes reference Detail 1/S501 (column base and footing) and Detail 4/S-501 (girt
Questions
Confirm proposals may be
submitted by email to
[email protected] or
clarify who within the GOV
proposals are to be emailed.
Answers
Yes, Proposals should be
emailed to:
[email protected] &
[email protected]
Confirm Contractors shall
price from the 35%
documents as the complete
scope.
Confirm this is not a designbuild order, no Design
Program Manager or design
or engineering services is
required.
Correct. LL
Provide the total quantity and
location of posts and footings
to be replaced.
Refer S-101, keynote 1 for
quantity and locations. LL
Only design as noted in the
documents. Delegated items
for shoring, wood
modifications not included in
the design, shop drawings for
concrete work and
wood/connections. LL
Issue Details 1/S-501 and 4/S- Details and info are shown on 501, including footing
S-501. LL
RFI’s for WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
connection). S-501 shows only
Details 2, 3 and 5.
Detail 3/S-501 Simpson CCQ86SDS2.5 column
cap is shown connecting the new
6x6 post to the existing (2) 2x10
beams, with existing blocking
between the beams to remain.