Home / NH100 Engine Control Unit Replacement / Document

Request for Proposals

Updated

A PDF document (201 KB) attached to NH100 Engine Control Unit Replacement, from the Department of the Navy. Due Dec 4, 2026, 1:00 PM (UTC-5).

File name: RFP 270700.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NH100 Engine Control Unit Replacement
MCB Camp Lejeune, North Carolina

Solicitation No. N40085-27-R-9006
Project No. 27-0700

ROICC CAMP LEJEUNE

POC: Jessica Huebner
[email protected]

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A

PROPOSAL FOR THIS PROJECT:

N40085-25-D-2516
T.E. Davis Construction Company
1175 East Davis Rd.
Jacksonville, NC 28546
POC: Brandon Horne
(910) 353-3112
[email protected]

N40085-25-D-2517
Joyce & Associates Construction, Inc.
6994 HWY 70
Newport, NC 28570
POC: Robert Bittner
(252) 223-3171
[email protected]

N40085-25-D-2518
Olympic Enterprises, Inc.
282 Hubert Blvd.
Hubert, NC 28539
POC: Mark Xanthos, Sr
(910) 389-1571
[email protected]

N40085-25-D-2519
Quadrant Construction
116 Center Street
Jacksonville, NC 28546
POC: Chris Whaley
(910) 937-0003
[email protected]

11/13/2026

NH100 Engine Control Unit Replacement
MCB Camp Lejeune, North Carolina

Solicitation No. N40085-27-R-9006
Project No. 27-0700

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-27-R-9006
Public Works Project No.: 27-0700
Title: NH100 Engine Control Unit Replacement
Contract Completion Date: 60 day period of performance after COR has verified on-site receipt of OEM Materials.
Estimated Cost Range: Between $500,000 and $1,000,000
Wage Determination: General Decision Number: NC20260010 5/18/2026 Building Liquidated Damages: $4,686.73 per Calendar Day
Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification. Special Scheduling: The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.
Basis for Award: Lowest Price
Proposal Acceptance Period: 30 days from receipt of offers Site Visit: Site visit scheduled for November 16, 2026, at 0900. Contractors shall meet at the Facilities building, NH118, Camp Lejeune, NC.
Bond Requirements: Bid bonds are required based on the dollar values listed below. If required, the bid bond should be 20% of the proposal amount. An electronic copy of your bid bond may be submitted with your proposal. Failure to submit a required bid bond by the deadline will result in your proposal being removed from consideration. Utilize the bond formats at FAR 53.300.

The beginning of the document. Download the full file to read on.

Other documents in this bid