Request for Quotations Sta Saginaw River Galley Flooring
Updated
A Word document (3.1 MB) attached to USCG Station Saginaw River Galley Flooring, from the US Coast Guard. Due Dec 3, 2026, 4:00 PM (UTC-5).
File name: RFQ 70ZL1727QCLEV0004 Sta Saginaw River Galley Flooring.docx
The full file is for paid members, or buy this bid alone.
Preview
TO ACCESS THE STANDARD FORM (SF) 1442, DOUBLE-CLICK ON ABOVE ICON.AFTER OBTAINING THE SF 1442, CLOSE THE DOCUMENT AND CONTINUE SCROLLING DOWN FROM THIS POINT TO OBTAIN THE REMAINDER OF THE REQUEST FOR QUOTE (RFQ).YOU MUST RETURN ONE (1) COMPLETE COPY OF THE ENTIRE SOLICITATION PACKAGE (SF-1442, AND SECTIONS B-M, PLUS THE REFERENCE SHEET). PLEASE EMAIL YOUR QUOTE TO THE ADDRESS LISTED IN BLOCK 8 OF SF-1442.DO NOT CALL TO INQUIRE IF YOUR BID HAS BEEN RECEIVED AS THIS INFORMATION WILL NOT BE RELEASED.
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B-1. Base Quote: Provide all necessary labor, materials, and equipment necessary to remove existing tile flooring in galley and install new tile flooring at USCG Station Saginaw River, 2405 Weadock HWY, Essexville, MI 48732
All work shall be performed in accordance with the Statement of Work or Performance Work Statement (Dated 13 OCT 2026) in Section J and the clauses and provisions incorporated herein.
(Please insert the bid amount in Block 17, SF-1442, Page 2).
NOTE: All quotes shall include taxes – no tax exemption certificate will be issued.
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C-1. See the Statement of Work (Dated 13 OCT 2026) in Section J.
SECTION D - PACKAGING AND MARKINGD-1. All correspondence, submittals, emails etc. shall be marked with the solicitation number, 70ZL1727QCLEV0004.
SECTION E - INSPECTION AND ACCEPTANCEA. FEDERAL ACQUISITION REGULATION (48 CFR, CHAPTER 1) CLAUSESE-1. FAR 52.246-12 Inspection of Construction (AUG 1996). SECTION F - DELIVERIES OR PERFORMANCEA. FEDERAL ACQUISITION REGULATION (48 CFR, CHAPTER 1) CLAUSESF-1. FAR 52.211-10 Commencement, Prosecution & Completion of Work (APR 1984). The Contractor shall be required to (a) commence work under this contract within 05 calendar days, (b) prosecute the work diligently, and (c) complete the entire contract within 30 calendar days after receipt of a Notice of Award. The time stated for completion shall include final cleanup of the premises.
The Performance Period includes 0 weather days. The definition of weather day is as follows: A weather day must prevent work for 50 percent or more of the Contractor workday and delay work critical to the timely completion of the project. If the number of actual weather days exceeds the number of days anticipated by the Coast Guard, then the Contracting Officer may convert the qualifying days to calendar days and issue a modification in accordance with the contract clause entitled “Default (Fixed Price Construction).”
The beginning of the document. Download the full file to read on.