Statement of Work and Specifications for

Replacement of Flooring in Galley
At
U.S. Coast Guard
Station Saginaw River
Essexville, MI.

13, October 2026

Officer in Charge
United States Coast Guard
Station Saginaw River
2405 Weadock HWY
Essexville, MI 48732

Background
The quarry tile flooring in the gally of STA Saginaw has failed with several tiles popping off the floor. It was a hot summer day, and the A/C had failed in the building; raising the temperature in the facility. When the A/C was repaired, it was determined the change in atmosphere caused an expansion; which popped the tiles from the floor. The intent of this project is to remove approximately 450 Sqft of quarry tile from the galley and hallway next to the galley; install new quarry tile.
1. SCOPE: Contractor shall supply all supervision, labor, equipment, and materials for the removal of existing quarry tile, thin-set mortar bed, and all debris within the galley and the hallway next to the galley. For bidding purposes, the total approximately square footage of tile is 450 Sqft. Contractors shall also supply all supervision, labor, equipment, and materials to remove and reinstall all interferences, install replacement quarry tile floor. 





Remove and all interferences; cook range, sink, counter tops, Fridge ect… Remove all old tile, mortar, and debris.
Remove Cove Base. Approximately 70 ft (Contractor Field virility) Prep floor surface for new tile.
Install new quarry tile.
Install new Cove Base.
Re-install cook range, sink, counter tops, Fridge ect..

2. GOVERNMENT FACILITIES AND UTILITIES: Electrical power of 120v and water are available on the site. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded. Telephone services will not be available for use by the contractor.
3. ONSITE TECHNICAL REPRESENTATIVE: The Onsite Technical Representative (OTR) will be MKCS Travis J. VanWinkle (402)-709-4114. OTR Alternate will be MK1 Curtis B. Gustin (989) 233-3756.

4. MATERIALS AND LOCATIONS:

a. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturer’s recommendations in a clean, dry, well-ventilated area. Stored materials shall be protected from sunlight, and kept away from excessive heat. The contractor shall not store any highly flammable