REVISION 1 SPECIFICATIONS 657-26-602
Updated
A PDF document (6.1 MB) attached to 657-26-602 Create Observation Unit JC, from the Department of Veterans Affairs. Due Nov 6, 2026, 2:00 PM (UTC-6).
File name: REVISION 1 SPECIFICATIONS 657-26-602.pdf
The full file is for paid members, or buy this bid alone.
Preview
657-26-602JC Create Observation Unit, JC
St. Louis VA Health Care System
100% Bid Documents
VA St. Louis Health Care System
Facilities Engineering Service
Specifications
Create Observation Unit, JC
Project Number: 657-26-602JC
U.S Department of Veterans Affairs
VA St. Louis Health Care System
John Cochran Division
St. Louis, MO
100% BID DOCUMENTS
05 OCT 2026
657-26-602JC Create Observation Unit, JC
St. Louis VA Health Care System
100% Bid Documents
01-01-26
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
00 01 15
DIVISION AND SECTION TITLES
DIVISION 00 - SPECIAL SECTIONS
List of Drawing Sheets
DATE
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 32 16.15
01 33 23
01 35 26
01 42 19
01 45 00
01 74 19
01 91 00
General Requirements
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Construction Waste Management
General Commissioning Requirements
11-21
12-25
06-25
05-24
11-20
02-21
04-22
04-22
DIVISION 02 – EXISTING CONDITIONS
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00
07 92 00
Firestopping
Joint Sealants
01-21
04-22
DIVISION 08 - OPENINGS
DIVISION 09 – FINISHES
09 29 00
09 91 00
Gypsum Board
Painting
04-20
01-21
DIVISION 10 – SPECIALTIES
00 01 10-1
657-26-602JC Create Observation Unit, JC
St. Louis VA Health Care System
100% Bid Documents
01-01-26
SECTION NO
DIVISION AND SECTION TITLES
DIVISION 11 – EQUIPMENT
DATE
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 13 13
Wet-Pipe Sprinkler Systems
06-15
DIVISION 22 – PLUMBING
22 05 11
22 05 23
22 07 11
22 11 00
22 13 00
Common Work Results for Plumbing
General-Duty Valves for Plumbing Piping
Plumbing Insulation
Facility Water Distribution
Facility Sanitary and Vent Piping
01-23
09-20
09-19
05-21
09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11
23 05 12
23 05 41
23 05 93
23 07 11
23 08 00
23 09 23
23 23 00
23 37 00
23 81 00
Common Work Results for HVAC
General Motor Requirements for HVAC and Steam
Generation Equipment
Noise and Vibration Control for HVAC Piping and
Equipment
Testing, Adjusting, and Balancing for HVAC
HVAC and Boiler Plant Insulation
Commissioning of HVAC Systems
Direct-Digital Control System for HVAC
The beginning of the document. Download the full file to read on.