1. Do we need to plan for the Project Manager to be onsite full time, or can the PM be onsite a portion of the time?
The Project Manager may be onsite part of the time; however, the assigned Superintendent shall be onsite at all times.
2. Will the Government revise the Experience Modification Rate (EMR) requirement from “equal to or less than 1.0” to “equal to or less than 1.10”? An EMR of 1.0 represents the industry baseline, and EMR values for small firms can vary from year to year based on a limited number of claims. A modest tolerance would preserve the Government’s safety objective while broadening competition among qualified SDVOSB offerors.
This will not be changed, it will remain as “equal to or less than 1.0” 3. Can phases of 5 rooms be performed in immediate succession, or is there an anticipated down time between phases that will require additional mobilizations between phases? It is expected that there will be no anticipated down time between phases of 5 rooms. 4. Are there any items stored in the building that the contractor will not be allowed to move or relocate? Except for IT items and items containing personal or patient information, the contractor shall relocate all items.
5. Where should personal items and furniture be stored during each phase of construction? VA will relocate personal items; the contractor shall find a location outside the VA for storing furniture at their own expense. When re-installing furniture, the VA will let the contractor know if a room is getting new furniture. If new furniture is installed, the VA will install. 6. Is a notarized copy of a physical bid bond for 20% of the project value required at time of bid submission, or does the contractor only need to verify bonding capabilities at the time of bid? Yes, a signed notarized copy of a physical bid bond needs to be submitted at the time of bid. 7. Should the contractor assume painting doors and trim in addition to all walls? The contractor will not paint any doors and trim in addition to all the walls. Contractor to inspect door frames and touch up if needed to match existing door frame color. 8. Should the stairwells and bathroom walls/ceiling be painted? No
9. Do stained doors need to be re-stained?
Stained doors do not need to be re-stained; however, all wood doors are to be wiped down, and tape and tacks to be removed.
10. Please confirm that the base price should be for off hours labor. Refer to Scope of Work (SOW) - 1. General Intention, Section H.