Home / 612A4-27-018 | Replace B650 3rd and 2nd Flooring / Document

Specifications - Replace B650 3rd and 2nd Flooring REV1

Updated

A PDF document (1.1 MB) attached to 612A4-27-018 | Replace B650 3rd and 2nd Flooring, from the Department of Veterans Affairs. Due Nov 12, 2026, 12:00 PM (UTC-8).

File name: Specifications - 612A4-27-018 Replace B650 3rd and 2nd Flooring REV1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DEPARTMENT OF VETERANS AFFAIRS

SPECIFICATIONS

“Replace B650 3rd and 2nd Flooring”

Bridging Documents
For
VA Northern California HCS
10535 Hospital Way,
Mather, CA 95655
October 8, 2026

VA NORTHERN CALIFORNIA HEALTH CARE SYSTEM

REPLACE B650 3RD AND 2ND FLOORING

PROJECT #612A4-27-018

DEPARTMENT OF VETERANS AFFAIRS VHA

MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 10

05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 33 23

01 35 26

01 42 19

01 45 00

01 74 19

01 81 13

General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Construction Waste Management
Sustainable Construction Requirements

11-21
09-22
10-22
11-20
02-21
04-22
10-17

DIVISION 02 – EXISTING CONDITIONS

02 41 00

Demolition

08-17

DIVISION 09 – FINISHES

09 05 16

09 06 00

09 29 00

09 65 13

09 65 16

09 65 19

09 68 00

09 91 00

Subsurface Preparation for Floor Finishes
Schedule for Finishes
Gypsum Board
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tile Flooring
Carpeting
Painting

00 01 10-1

01-21
01-21
04-20
01-21
05-18
05-18
01-21
01-21

NCVAHCS, Mather

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A.

Contractor shall furnish all labor, materials, equipment, supervision, and necessary engineering to perform the work as required by the project specifications and drawings. This shall include, but not limited to, completely preparing site for building operations, all demolition activities and/or removal of existing structures required to perform the work, foundations, superstructure, mechanical, electrical, plumbing, special systems, and other site improvements.

B.

Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) or the designated Contracting Officer Representative (COR).

C.

All work associated with this scope of work shall occur at Building 650 at the Sacramento Veterans Affairs Medical Center (VAMC).

D.

The work site is located at 10535 Hospital Way, Mather, CA 95655.

E.

All work shall comply with all applicable international building codes, DOT standards, and the Veterans Affairs’ Master Construction Specifications.

F.

All work must be coordinated through the COR.

G.

Final payment will not be made without the approval of the Contracting Office: either the assigned CO or the assigned Contracting Specialist

The beginning of the document. Download the full file to read on.

Other documents in this bid