Specifications - Replace B650 3rd and 2nd Flooring REV1
Updated
A PDF document (1.1 MB) attached to 612A4-27-018 | Replace B650 3rd and 2nd Flooring, from the Department of Veterans Affairs. Due Nov 12, 2026, 12:00 PM (UTC-8).
File name: Specifications - 612A4-27-018 Replace B650 3rd and 2nd Flooring REV1.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF VETERANS AFFAIRS
SPECIFICATIONS
“Replace B650 3rd and 2nd Flooring”
Bridging Documents
For
VA Northern California HCS
10535 Hospital Way,
Mather, CA 95655
October 8, 2026
VA NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REPLACE B650 3RD AND 2ND FLOORING
PROJECT #612A4-27-018
DEPARTMENT OF VETERANS AFFAIRS VHA
MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
DIVISION AND SECTION TITLES
DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 10
05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00
01 33 23
01 35 26
01 42 19
01 45 00
01 74 19
01 81 13
General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Construction Waste Management
Sustainable Construction Requirements
11-21
09-22
10-22
11-20
02-21
04-22
10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00
Demolition
08-17
DIVISION 09 – FINISHES
09 05 16
09 06 00
09 29 00
09 65 13
09 65 16
09 65 19
09 68 00
09 91 00
Subsurface Preparation for Floor Finishes
Schedule for Finishes
Gypsum Board
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tile Flooring
Carpeting
Painting
00 01 10-1
01-21
01-21
04-20
01-21
05-18
05-18
01-21
01-21
NCVAHCS, Mather
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A.
Contractor shall furnish all labor, materials, equipment, supervision, and necessary engineering to perform the work as required by the project specifications and drawings. This shall include, but not limited to, completely preparing site for building operations, all demolition activities and/or removal of existing structures required to perform the work, foundations, superstructure, mechanical, electrical, plumbing, special systems, and other site improvements.
B.
Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) or the designated Contracting Officer Representative (COR).
C.
All work associated with this scope of work shall occur at Building 650 at the Sacramento Veterans Affairs Medical Center (VAMC).
D.
The work site is located at 10535 Hospital Way, Mather, CA 95655.
E.
All work shall comply with all applicable international building codes, DOT standards, and the Veterans Affairs’ Master Construction Specifications.
F.
All work must be coordinated through the COR.
G.
Final payment will not be made without the approval of the Contracting Office: either the assigned CO or the assigned Contracting Specialist
The beginning of the document. Download the full file to read on.