SAM Questions and Answers
Updated
A PDF document (84 KB) attached to 13-8 Mo Stainless Steel Welding Wire, AMS 5840, 0.045" Diameter, Spool, from the Department of Energy. Due Nov 20, 2026, 5:00 PM (UTC-5).
File name: SAM RFQ507991 Questions and Answers.pdf
The full file is for paid members, or buy this bid alone.
Preview
SAM posting (507991) Questions & Answers
1. The Bill of Materials specifies 1,200 spools of 0.045-inch AMS 5840 welding wire. What is the required net weight or wire length per spool? Is a particular spool diameter, core size, or packaging configuration required? Answer: We need 1,200 lbs. of AMS5840 welding wire with a diameter of 0.045 inches. The packing configuration, core size, and spool diameter can be dictated be either standard spools (size 33#) or drums (size 500#).
2. Is the stated quantity of 1,200 spools correct? May delivery be phased, and what is the required delivery date and receiving location?
Answer: The quantity should be 1,200 lbs, spread across several spools or drums, according to what the supplier can provide. Delivery may be phased. Required delivery date is 6 - 8 weeks issuing PO. Receiving location is 1 Bethel Valley Road, Bldg 7120 PO Box 2008 Oak Ridge, TN 37830.
3. Is WeldTool mandatory, or may we offer technically equivalent AMS 5840 material under FAR 52.211-6? If equivalents are permitted, what comparative technical documentation is needed?
Answer: WeldTool is not mandatory, technically equivalent AMS 5840 is acceptable. Material certification and SDS data sheets are required for comparison and evaluation of technical equivalence.
4. What proof of authorized-reseller status is required, especially for an approved equivalent from a different manufacturer?
Answer: Authorized Reseller Letter or similar that shows the vendor is authorized by the manufacturer to resell the manufacturer’s products.
5. Are certificates of conformance, mill test reports, heat/lot traceability, or other quality documentation required? Is a specific revision of AMS 5840 required? Answer: No.
6. The RFQ requests a representations-and-certifications form dated September 30, 2026, while Attachment D provided is dated March 9, 2026. Which version should we complete?
Answer: March 9, 2026 is the most recent date of the reps and certs. September 30, 2026 date is the revision date of our Terms & Conditions and Prime Flowdowns. So the March 9th version is completely up to date and acceptable. 7. The final-acceptance language refers to testing after installation of a system. Please confirm the applicable acceptance/inspection criteria for this consumable welding wire.
Answer: Not needed for consumable material.
8. Please confirm payment terms and any supplier-onboarding requirements for the resulting purchase order.
Answer: Payment terms are Net 30 days from receipt of proper invoice. Supplier will be
The beginning of the document. Download the full file to read on.