SCHEDULE OF ITEMS
0403 SERV NEW Nelson Dr Fuel Tank Removal
Jackson Ranger District
Bridger-Teton National Forest
Teton County, Wyoming
Item Number
Description
119.01
Mobilization
265.01
Tank Removal, Housing – This item includes
removal and disposal of two (2) underground
heating oil storage tanks, anticipated to be
approximately 300-gallons. The two tanks
service a duplex, one (1) tank for each
housing unit. Work requires the potential
removal of uncontaminated soil. Removal also
includes all piping and appurtenances,
backfilling the excavation and native soil
surface restoration to existing conditions. Item
also includes sampling the soil around the
tank and decommissioning the tank to
Wyoming Department of Environmental
Quality (WYDEQ) requirements and
standards.
330.01
330.01
Selective Demolition - Removal of Concrete
Sidewalk, Portland Cement Concrete, 4-inch
thickness
Method of
Unit
Measurement
Base Bid Items
CQ
LSQ
Quantity
Unit Price
Total
CQ
LSQ
AQ
SF
AQ
SF
Subtotal
Option Bid Item
312.02
Removal of Contaminated Soil per CY. See
Also Specification Section 312000 Earth
Moving. Contaminated soil must be removed
and disposed in a State Authorized disposal
facility for contaminated soil. NTE 20-cubic
yards
CQ
CY
Total with Option Item
Notes:
1. Contract Time for Base and Option Line Items = 30 Calendar Days. Option item to be awarded at time of Base Line Items. 2. Payment for bond premiums will be required in accordance with FAR 52.228-15. In accordance with FAR Clause 52.232-5, PaymentsUnder Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Base Item 119.01–Mobilization.
The beginning of the document. Download the full file to read on.