CONTRACT SPECIFICATIONS

HVAC DIAGNOSTIC AND REPAIRS

AT

UNITED STATES COAST GUARD

STATION LAKE WORTH INLET,

RIVIERA BEACH, FL

Project Number 33644239 - WO # 27-189 - Repair HVAC STA

BULDG (CGD-SE)

OCTOBER 2026

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1.

GENERAL DESCRIPTION

1.1.1.

General Work Requirements
Perform a comprehensive assessment of the facility’s HVAC and cooling tower systems to identify deficiencies, operational issues, and required repairs or replacements.
Inspect HVAC equipment, cooling towers, pumps, piping, controls, and associated systems
Evaluate overall system condition, operation, and performance Perform testing and take operational readings as needed Identify deficiencies, equipment failures, and probable causes of performance issues
Recommend repairs, maintenance, additional testing, or equipment

replacement as necessary
Provide a summary report with findings, photos, recommended corrective actions, and budgetary costs

SPECIFIC WORK REQUIREMENTS

A. Qualifications

(1)

The installation shall be performed by an HVAC contractor certified in the state of Florida.

(2)

The installation shall comply with the most current edition of the National Electric Code.

B. Additional Performance Requirements

(1)
1.1.2.

Contractor shall be responsible to dispose of any materials necessary.

SPECIAL WORK REQUIREMENTS

A. Comply with all hot work requirements of the Coast Guard unit. B. Coordinate all staging and laydown areas with the Coast Guard prior to work starting.

1.2.

TEMPORARY FACILITIES OR UTILITIES

Section 01 11 00

None required.
1.3.

PROJECT PERFORMANCE PERIOD

A. The total contract performance period shall include not only the time needed to complete the base bid and approved option items, but it also includes the time needed to submit, review, and approve all material submittals, and complete all project record (closeout) documents. After work begins at the site, perform the work continuously during normal working hours and show daily progress until all work is complete.
B. The total contract performance period is 14 calendar days.

1.4.

LOCATION

The work is located at:
U.S. Coast Guard
Station Lake Worth Inlet
3300 Lakeshore Dr.
Riviera Beach, FL 33404

Arrangements for visiting the site may be made by contacting:

MKC MARISSA MASSEY

Email: [email protected]

Telephone: 561-718-0424
1.5.

DRAWINGS ACCOMPANYING SPECIFICATION

There are no drawings accompanying this specification.

1.6.

WORK HOURS

1.6.1.

Normal Working Hours
A. Perform all work at the site from Monday through Friday from