DESIGN-BUILDER IDIQ
CONTRACT #
DATE
STATEMENT OF WORK
Progressive Design-Build of new FLL Airport Traffic Control Tower (ATCT) at Fort Lauderdale, FL
I.
PROJECT NAME AND LOCATION ID:
Phase 1 and Phase 2 services for a new ATCT (Airport Traffic Control Tower) and Base Building for the Fort Lauderdale Hollywood International Airport (FLL) in Fort Lauderdale, FL.
II.
PROJECT GENERAL INFORMATION: F L L ATCT AND BASE BUILDING REPLACEMENT
The project involves Phase 1 Validation, Preliminary Design & Preconstruction Services, and Phase 2 Construction Services of a new ATCT Facility in Fort Lauderdale, Florida This Statement of Work (SOW) sets forth the requirements for Phase 1 of the new FLL ATCT. Phase 2 requirements are described below, however the SOW will be developed and priced as part of Phase 1. Phase 1 will include validation, preliminary design to anticipated 60-70% completion, preconstruction services, and cost modeling/pricing. Phase 2 will include final design completion, full construction services, and commissioning and warranties for the ATCT facility. The scope of both Phases includes all services necessary for the planning, design review, engineering review, construction permitting, construction, commissioning and turnover of the ATCT and associated site work. The facility must be designed and constructed to meet or exceed all applicable federal, state, and local building codes, with specific emphasis on hurricane wind loads, floodplain protection and FAA orders and standards. The following two (2) scope areas have been defined for this Project. Scope Area A: New ATCT
Scope Area A consists of all work related to the design and construction of the new ATCT and associated site and underground utility work to support a fully functioning facility. Scope Area B: Final Parking and Site Configuration
Scope Area B consists of all remaining work to deconstruct the existing ATCT, reconfigure the site and accommodate appropriate parking for the new ATCT. The end result of this scope area should be a fully completed site with parking and all other amenities to support operations at the new ATCT.
The design must be in accordance with the following:
A. FAA FLL Requirements Document for Space Allocation Table. B. FAA ATCT Draft Siting Report for FLL.
C. Terminal Facilities Design Standard (TFDS) Version 2.4.
D. Supplemental Requirements to TFDS
E. Minimum Wind Tunnel Testing Requirement (FLL)
F. Design documents and specifications for this project must be in accordance with