140R2026R0018 Bradbury Dam Outlet Valve Replacement

SECTION C - DESCRIPTION / SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00

01 14 10

01 14 30

01 31 22

01 31 30

01 32 10

01 33 00

01 33 26

01 35 10

01 35 20

01 35 30

01 51 00

01 51 37

01 54 20

01 55 00

01 56 10

01 60 00

01 74 00

01 78 30

Summary of Work
Use of Site
Interruption of Service
Coordination Meetings
Contract Document Management System
Construction Program
Submittals
Electrical Drawings and Data
Safety Data Sheets
Safety and Health
Contractor’s Onsite Safety Personnel
Temporary Utilities
Temporary Bypass Pump System
Use of Government Crane
Vehicular Access and Parking
Protection of Existing Installations
Product Requirements
Cleaning and Waste Management
Project Record Documents

DIVISION 03 - CONCRETE

03 62 20

Nonshrink Grout for Equipment and Metalwork

DIVISION 05 - METALS

05 50 00

Metal Fabrications

DIVISION 09 - FINISHES

09 96 20

Coatings

DIVISION 26 - ELECTRICAL

26 05 02

26 05 10

26 05 20

Basic Electrical Materials and Methods
Conductors and Cables
Grounding and Bonding

00 01 10 - 1

Fixed-Cone Valve Replacement
Bradbury Dam – Outlet Works
Cachuma Project, CA

26 05 33

26 05 90

26 24 24

Specification No. 20-C0923

Raceways and Boxes
Wiring Checkout and Tests
Distribution Panelboards

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 22 25

Valves

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00

51 00 50

Information Available to Offerors
Electronic Media Release

DIVISION 52 - DRAWINGS

52 00 00

Drawings

END OF CONTENTS

00 01 10 - 2

Fixed-Cone Valve Replacement
Bradbury Dam – Outlet Works
Cachuma Project, CA

Specification No. 20-C0923

SECTION 01 11 00

SUMMARY OF WORK

PART 1

GENERAL

1.01

BACKGROUND

A.

The Bradbury Dam Outlet Works (Outlet Works) was constructed to release storm water flows and prior water rights flows for downstream users. The outlet works arrangement utilizes a diversion tunnel running through the Monterey formation of the left abutment of the dam. Water is conveyed through a concrete-lined tunnel before transitioning to a 38-inch diameter pipe at the approximate midpoint of the outlet line. Once at the Outlet Works, the water proceeds through a trifurcation and is discharged by two 30-inch fixedcone valves and a 10-inch butterfly valve. The Outlet Works has been positioned so that discharges from the valves are released into Bradbury Dam’s stilling basin.

1.02

LOCATION

A.

Work is located at Bradbury Dam approximately 20 miles northwest of Santa Barbara,