Section C - DESCRIPTION SPECIFICATIONS 0004
Updated
A PDF document (4.0 MB) attached to Bradbury Dam Outlet Valve Replacement, from the Departmental Offices. Due Oct 27, 2026, 12:00 PM (UTC-7).
File name: Section_C_-_DESCRIPTION__SPECIFICATIONS_0004.pdf
The full file is for paid members, or buy this bid alone.
Preview
140R2026R0018 Bradbury Dam Outlet Valve Replacement
SECTION C - DESCRIPTION / SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 10
01 14 30
01 31 22
01 31 30
01 32 10
01 33 00
01 33 26
01 35 10
01 35 20
01 35 30
01 51 00
01 51 37
01 54 20
01 55 00
01 56 10
01 60 00
01 74 00
01 78 30
Summary of Work
Use of Site
Interruption of Service
Coordination Meetings
Contract Document Management System
Construction Program
Submittals
Electrical Drawings and Data
Safety Data Sheets
Safety and Health
Contractor’s Onsite Safety Personnel
Temporary Utilities
Temporary Bypass Pump System
Use of Government Crane
Vehicular Access and Parking
Protection of Existing Installations
Product Requirements
Cleaning and Waste Management
Project Record Documents
DIVISION 03 - CONCRETE
03 62 20
Nonshrink Grout for Equipment and Metalwork
DIVISION 05 - METALS
05 50 00
Metal Fabrications
DIVISION 09 - FINISHES
09 96 20
Coatings
DIVISION 26 - ELECTRICAL
26 05 02
26 05 10
26 05 20
Basic Electrical Materials and Methods
Conductors and Cables
Grounding and Bonding
00 01 10 - 1
Fixed-Cone Valve Replacement
Bradbury Dam – Outlet Works
Cachuma Project, CA
26 05 33
26 05 90
26 24 24
Specification No. 20-C0923
Raceways and Boxes
Wiring Checkout and Tests
Distribution Panelboards
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 22 25
Valves
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00
51 00 50
Information Available to Offerors
Electronic Media Release
DIVISION 52 - DRAWINGS
52 00 00
Drawings
END OF CONTENTS
00 01 10 - 2
Fixed-Cone Valve Replacement
Bradbury Dam – Outlet Works
Cachuma Project, CA
Specification No. 20-C0923
SECTION 01 11 00
SUMMARY OF WORK
PART 1
GENERAL
1.01
BACKGROUND
A.
The Bradbury Dam Outlet Works (Outlet Works) was constructed to release storm water flows and prior water rights flows for downstream users. The outlet works arrangement utilizes a diversion tunnel running through the Monterey formation of the left abutment of the dam. Water is conveyed through a concrete-lined tunnel before transitioning to a 38-inch diameter pipe at the approximate midpoint of the outlet line. Once at the Outlet Works, the water proceeds through a trifurcation and is discharged by two 30-inch fixedcone valves and a 10-inch butterfly valve. The Outlet Works has been positioned so that discharges from the valves are released into Bradbury Dam’s stilling basin.
1.02
LOCATION
A.
Work is located at Bradbury Dam approximately 20 miles northwest of Santa Barbara,
The beginning of the document. Download the full file to read on.