Home / Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management… / Document

Site Visit Appendix B Draft Timber Specifications Scaled

Updated

A PDF document (1.5 MB) attached to Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management Unit, from the Forest Service. Due Nov 2, 2026, 1:00 PM (UTC-8).

File name: Z02c_Site Visit_Appendix B_Draft Timber Specs Scaled_12363N27Q4000.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Cowboy Hat Cut-to-Length Stewardship IRSC

Lake Tahoe Basin Management Unit
Lake Tahoe Basin

DRAFT APPENDIX B - SCALED

STEWARDSHIP CONTRACT - TIMBER REMOVAL SPECIFICATIONS

B6.42 Skidding and Yarding
B6.421 Rigging
B6.422 Landings and Skid Trails
B6.423 Skidding on Roads
B6.424 Arches and Dozer Blades
B6.63 Temporary Roads
B6.64 Landings
B6.65 Skid Trails and Fire Lines
B6.66 Current Operating Areas
B6.67 Erosion Control Structure Maintenance
B6.7 Slash Disposal
B6.8 Scaling
B6.81 Scaling Services
B6.811 Scaling Location
B6.812 Scaling Adjustments
B6.813 Delayed or Interrupted Scaling Services
B6.814 Weighing Services
B6.82 Presentation for Scaling
B6.83 Scaling Other Products
B6.84 Accountability
B6.841 Route of Haul
** B6.842 Product Identification
B6.85 Scaling Lost Products
B6.851 Scaling Lost Sample Loads
B6.86 Scale Reports

B8.0 OTHER CONDITIONS

B8.1 Title and Liability
B8.11 Title Passage
B8.12 Liability for Loss
B8.32 Modification for Catastrophe
B8.5 Sale of Other Materials

B9.0 PERFORMANCE AND SETTLEMENT

B9.5 Settlement
B9.6 Contract Closure

D

R

AF
T

B1.0 CONTRACT AREA

B1.1 Contract Area Map
B1.2 Claims

B2.0 TIMBER SPECIFICATIONS

B2.1 Included Timber
B2.11 Standard Timber
B2.12 Substandard Timber
B2.13 Damaged Timber
B2.131 Damaged by Contractor
B2.132 Negligent or Willful Damage
B2.134 Minor Damage by Natural Causes
B2.14 Unintentionally Cut Timber
B2.15 Construction Timber
B2.16 Other Material
B2.2 Utilization and Removal of Included Timber
B2.3 Timber Designations
B2.31 Clearcutting Units
B2.32 Construction Clearing
B2.33 Overstory Removal Units
B2.34 Understory Removal Units
B2.35 Individual Trees
B2.37 Minor Changes
B2.4 Volume Estimate

B3.0 RATES OF PAYMENT

B3.1 Current Contract Rates
B3.4 Other Payment Rates
B.341 Material Not in Division A
B3.42 Timber Cut Through Mistake
B3.43 Designated Timber Cut But Not Removed
B3.44 Undesignated Timber Damaged Without
Negligence
B3.45 Undesignated Timber Unnecessarily Damaged
or Negligently or Willfully Cut
B3.46 Liquidated Damages
B3.47 Defect Caused by Abnormal Delay

B4.0 PAYMENTS

B4.1 Amount Payable for Timber
B4.2 Integrated Resource Account
B4.21 Cash Deposits
B4.215 Deposits When Payment Guarantee
B4.218 Cooperative Deposits
B4.24 Refund after Scaling Completed
B4.4 Payments Not Received

B5.0 TRANSPORTATION FACILITIES

B5.1 Authorization

The beginning of the document. Download the full file to read on.

Other documents in this bid