Cowboy Hat Cut-to-Length Stewardship IRSC
Lake Tahoe Basin Management Unit
Lake Tahoe Basin
DRAFT APPENDIX C
C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
ROAD
All
Temporary
Roads
TERMINI
FROM
TO
Beginning
End
MILES
T-802
Approx.
1.4
ROAD MAINTENACE T-SPECIFICATIONS
T-803 T-804 T-805 T-806 T-807 T-808
C
C
C
T-809
C
DURING HAUL
All
Temporary
Roads
TERMINI
FROM
TO
Beginning
End
MILES
T-802
ROAD MAINTENACE T-SPECIFICATIONS
T-803 T-804 T-805 T-806 T-807 T-808
AF
T
ROAD
Approx.
1.4
C
C
C
T-809
C
POST HAUL
All
Temporary
Roads
TERMINI
FROM
TO
Beginning
End
MILES
Approx.
1.4
T-802
ROAD MAINTENACE T-SPECIFICATIONS
T-803 T-804 T-805 T-806 T-807 T-808
C
C
C
R
ROAD
D
Notes:
C = Contractor Performance Item
The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards
Revised 10.18.2022
C
T-809
C
Cowboy Hat Cut-to-Length Stewardship IRSC
Lake Tahoe Basin Management Unit
Lake Tahoe Basin
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
T-SPECIFICATIONS
Definitions
Slide and Slump Repair
Ditch Cleaning
Surfacing Blading
Surfacing Repair
Drainage Structures
Dust Abatement
Roadway Vegetation
Miscellaneous Structures
Waterbars
Barriers
Drainage Excavation
D
R
T-800
T-801
T-802
T-803
T-804
T-805
T-806
T-807
T-808
T-809
T-810
T-814
SPECIFICATION TITLE
AF
T
T-SPEC NUMBER
Revised 10.18.2022
Cowboy Hat Cut-to-Length Stewardship IRSC
Lake Tahoe Basin Management Unit
Lake Tahoe Basin
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used, the intent and meaning shall be interpreted as follows: 800-1.1—Agreement—Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance. These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval