Site Visit Q&A

1. ATCT (B998): Can we use armored fiber optic cabling inside from the transition point instead of running non-armored fiber in innerduct. The use of armored fiber will eliminate the need for innerduct. Or would you like it to be non-armored and in innerduct? Does the existing chase have enough space on each floor for a ¾” innerduct? Answer: Engineer recommends a transition splice and installing riser/planum cable inside the building. There should be plenty of space in the existing chase. 2. Are we boring under the two runways between LOC B1059 & FMQ-19 (Primary) and between TACAN & FMQ-19 (Backup). If so, are we installing conduit under these runways? Is this considered a unique situation that requires schedule 80? Are we encasing the pipe with concrete/slurry?
Answer: SCHD-80 conduit is required. CE does not currently require concrete, grout, or slurry encasement for the proposed Schedule 80/HDPE directional bore crossing beneath the runway. HDD drilling fluid utilized during the installation process is considered incidental to the bore operation and is not a separate encasement requirement. Please provide the proposed bore profile showing the minimum vertical separation between the top of the conduit and the bottom of the runway pavement structure, including base and subbase layers.
3. For direct burial fiber, can you provide a trenching detail? I.E. trench depth, shade material needed, backfill soil required (native or fill). Answer: Direct buried fiber is required to be double armored unless an alternate solution is proposed and approved by the government. CE concurs with the engineer’s recommendation regarding the conduit material. The conduit or direct buried fiber shall be installed with a minimum of 3 to 4 inches of shading material completely surrounding the direct buried fiber/pipe to provide adequate protection and support. The remainder of the trench backfill may consist of existing native materials.
Backfill shall be placed in maximum 8\-inch loose lifts and compacted to not less than 95 percent of the maximum dry density as determined by ASTM D1557. Moisture content shall be maintained within the range necessary to achieve the specified density. Compaction shall be performed in accordance with the contract specifications and verified through field density testing as required. Disturbed areas shall be restored to their original grade and condition upon completion of the work.
4. Will we need compaction tests on trench backfill? What intervals are they needed at?