Home / NGWSP Cutter Lateral Reach 21 Booster Plant / Document

Sol

Updated

A PDF document (284 KB) attached to NGWSP Cutter Lateral Reach 21 Booster Plant, from the Bureau of Reclamation. Due Jan 25, 2027, 10:00 AM (UTC-7).

File name: Sol_140RR027B0004.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

SEALED BID (IFB) INVITATION FOR BID

140RR027B0004

(Construction, Alteration, or Repair)

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

PAGE

11/02/2026

OF

PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

0044055792

CODE

7. ISSUED BY

8. ADDRESS OFFER TO

R40
Bureau of Reclamation
Upper Colorado Region
Regional Office
125 South State Street, Room 8100
Salt Lake City UT 84138

9. FOR

INFORMATION CALL

a. NAME

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

Philoma

Singer

5053245033

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

The principal components of work for the Cutter Lateral Reach 21 Booster Plant include, but are not limited to, the following:
1. Pre-engineered concrete booster pump station, concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections. 2. Installation of secondary regulation tank at Regulation Tank No. 3 site, foundation, electrical equipment, yard pipe, and pipe connections.
3. Erosion and scour restoration/prevention: a. Includes a retaining wall, swale, runoff channel, and site regrading.
4. Reinstallation of gravel surfacing at Regulation Tank No. 3 site. 5. Supervisory Control and Data Acquisition (SCADA) equipment and radio communications system.

11. The contractor shall begin performance within
award,

notice to proceed. This performance period is

calendar days and complete it within
mandatory

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.) YES

NO

calendar days after receiving

negotiable. (See

).

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and
local time

01/25/2027

copies to perform the work required are due at the place specified in Item 8 by

1000

(hour)

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due. b. An offer guarantee

is,

is not required.

The beginning of the document. Download the full file to read on.

Other documents in this bid