A PDF document (291 KB) attached to Turnout Buildings, from the Bureau of Reclamation. Due Nov 10, 2026, 10:00 AM (UTC-7).
File name: Sol_140R4026B0002.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
1. SOLICITATION NO.
SEALED BID (IFB) INVITATION FOR BID
140R4026B0002
(Construction, Alteration, or Repair)
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED
PAGE
08/13/2026
OF
PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
0044049792
CODE
7. ISSUED BY
8. ADDRESS OFFER TO
R40
Bureau of Reclamation
Upper Colorado Region
Regional Office
125 South State Street, Room 8100
Salt Lake City UT 84138
9. FOR
INFORMATION CALL
Bureau of Reclamation- FCCO
Attn: Philoma Singer
1235 La Plata Highway
Farmington, NM 87401
a. NAME
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
Brittney
Nielson
8015243724
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
The principal components of work for NGWSP Turnout Buildings include, but are not limited to the following:
A. Work consists of constructing a potable water delivery turnout building and associated improvements at each site.
B. Install at each site:
1.Sitework, including buried piping, valves, and accessories; access road (Coyote Canyon and Window Rock only); steel fencing with gate; gravel surfacing; and drainage. 2.Steel piping connection to existing steel lateral (supply) pipe. 3.Steel piping connection to existing steel distribution (delivery) pipe. 4.Buried thrust blocks.
5.Fiberoptic cable infrastructure from existing lateral alignment to building. 6.Precast concrete building and foundation, including geotechnical investigation, foundation design, and building design.
7.Interior exposed piping, valves, and accessories.
8.Building mechanical, electrical, controls, instrumentation, and security. Continued...
11. The contractor shall begin performance within
award,
notice to proceed. This performance period is
calendar days and complete it within
mandatory
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.) YES
NO
calendar days after receiving
negotiable. (See
).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
local time
11/10/2026
copies to perform the work required are due at the place specified in Item 8 by
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Invitation for Bids NGWSP Turnout Buildings
- Attachment 0 00 01 NGWSP TURNOUT BLDGS Specifications
- Attachment Small Business Subcontracting Plan
- Attachment Wage Determination Heavy - San Juan County NM
- Attachment Wage Determination Building - San Juan County NM
- NGWSP - FCWR Turnout Buildings Prebid Site Visit - 0001
- Sol Amendment 0001
- Attachment 1 00 01 Specifications 0002
- Attachment 3 1 00 02B Corrosivity Report NGWSP Turnout Bldgs 0002
- Attachment 3 1 00 02A Test Pit Log 0002
- Attachment 7: Wage Determination Heavy - McKinley County NM 0002
- Attachment 8: Wage Determination Building - McKinley County NM 0002