SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

SEALED BID (IFB) INVITATION FOR BID

140R4026B0002

(Construction, Alteration, or Repair)

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

PAGE

08/13/2026

OF

PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

0044049792

CODE

7. ISSUED BY

8. ADDRESS OFFER TO

R40
Bureau of Reclamation
Upper Colorado Region
Regional Office
125 South State Street, Room 8100
Salt Lake City UT 84138

9. FOR

INFORMATION CALL

Bureau of Reclamation- FCCO
Attn: Philoma Singer
1235 La Plata Highway
Farmington, NM 87401

a. NAME

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

Brittney

Nielson

8015243724

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

The principal components of work for NGWSP Turnout Buildings include, but are not limited to the following:
A. Work consists of constructing a potable water delivery turnout building and associated improvements at each site.

B. Install at each site:

1.Sitework, including buried piping, valves, and accessories; access road (Coyote Canyon and Window Rock only); steel fencing with gate; gravel surfacing; and drainage. 2.Steel piping connection to existing steel lateral (supply) pipe. 3.Steel piping connection to existing steel distribution (delivery) pipe. 4.Buried thrust blocks.
5.Fiberoptic cable infrastructure from existing lateral alignment to building. 6.Precast concrete building and foundation, including geotechnical investigation, foundation design, and building design.
7.Interior exposed piping, valves, and accessories.
8.Building mechanical, electrical, controls, instrumentation, and security. Continued...
11. The contractor shall begin performance within
award,

notice to proceed. This performance period is

calendar days and complete it within
mandatory

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.) YES

NO

calendar days after receiving

negotiable. (See

).

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and
local time

11/10/2026

copies to perform the work required are due at the place specified in Item 8 by