SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

SEALED BID (IFB) INVITATION FOR BID

140FF027R0003

(Construction, Alteration, or Repair)

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

PAGE

10/30/2026

OF

PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

0044046896

CODE

7. ISSUED BY

8. ADDRESS OFFER TO

F3C
FWS, Construction A/E Team 3
5275 Leesburg Pike
Falls Church VA 22041

9. FOR

INFORMATION CALL

[email protected]

a. NAME

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

Terrence

Anderson

6822940280

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Pixley NWR Water Recirculation System Design-Build, California. The contractor shall provide all design services, labor, materials, equipment, and supervision necessary to design and construct approximately 1.2 miles of PVC pipeline, a recirculation pump system, and a 12-foot-tall, gated chain-link security enclosure topped with barbed wire. Work shall comply with Attachment 1-4, Statement of Work (SOW), and the associated maps, specifications, and drawings identified in the solicitation's attachment list. The construction magnitude is estimated to be between $700,000.00 to $750,000.00. The office is located ¿ Meeting Point: LAT:

35°54'23.08"N

LONG: 119°22'33.14"W

Pixley National Wildlife Refuge
10811 Corcoran Road
Delano, CA 93215
Kern County, California
The anticipated performance period shall be completed within Notice to Proceed (NTP) + 120 Days being Continued...
11. The contractor shall begin performance within
award,

notice to proceed. This performance period is

calendar days and complete it within
mandatory

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.) YES

NO

calendar days after receiving

negotiable. (See

).

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and
local time

11/30/2026

copies to perform the work required are due at the place specified in Item 8 by

0900

(hour)

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

The beginning of the document. Download the full file to read on.