Home / Ca-San Luis Nwr-Fire System Rehab / Document

Sol

Updated

A PDF document (1.2 MB) attached to Ca-San Luis Nwr-Fire System Rehab, from the Departmental Offices. Due Nov 30, 2026, 1:00 PM (UTC-8).

File name: Sol_140FF027Q0035.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

SEALED BID (IFB) INVITATION FOR BID

140FF027Q0035

(Construction, Alteration, or Repair)

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

PAGE

10/29/2026

OF

PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

0044053075

CODE

7. ISSUED BY

8. ADDRESS OFFER TO

FC3
FWS Constr A/E 3
FWS, Construction A/E Team 3
5275 Leesburg Pike
Falls Church VA 22041

9. FOR

INFORMATION CALL

a. NAME

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

Terrence

Anderson

6822940280

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

The U.S. Fish and Wildlife Service requires a contractor to furnish all labor, materials, equipment, supervision, and other resources necessary to San Luis National Wildlife Refuge Visitor Center requires rehabilitation of its fire protection and domestic water systems to restore life-safety compliance, operational reliability, and compliance with NFPA, California Building/Plumbing/Electrical Codes, AWWA, and ASSE standards. at San Luis National Wildlife Refuge Visitor Center, approximately 10 miles from Los Banos California, in accordance with the attached statement of work, specifications, and drawings. The construction magnitude is estimated to be between $200,000.00 to $225,000.00. The contractor shall complete all work within 180 calendar days after receipt of the Notice to Proceed.

11. The contractor shall begin performance within
award,

notice to proceed. This performance period is

calendar days and complete it within
mandatory

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.) YES

NO

calendar days after receiving

negotiable. (See

).

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and
local time

11/30/2026

copies to perform the work required are due at the place specified in Item 8 by

1300

(hour)

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

The beginning of the document. Download the full file to read on.

Other documents in this bid