Solicitation Attachment 1 Specifications
Updated
A PDF document (1.9 MB) attached to SACN Replace Fire Alarms and Intrusions Systems, from the Departmental Offices. Due Nov 30, 2026, 1:00 PM (UTC-7).
File name: B08_Solicitation_Attach_1_Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
Saint Croix National Scenic Riverway (SACN)
Saint Croix Falls, WI
Contract Number: 140P6023D0002
Replace Existing Fire & Security Alarm System
SACN
PMIS NO. 245498
PROJECT SPECIFICATIONS
(100% Final Construction Documents)
02/28/25
NATIONAL PARK SERVICE
MIDWEST REGION
FEBRUARY 2025
This page intentionally left blank.
DIVISION 01 — GENERAL REQUIREMENTS
01 10 00 - DIVISION 01 GENERAL REQUIREMENTS - SHORT FORM
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
06 10 00 - ROUGH CARPENTRY
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 84 00 - FIRESTOPPING
07 92 00 - JOINT SEALANTS
DIVISION 08 — OPENINGS
08 11 00 - HOLLOW METAL DOORS AND FRAMES
08 14 16 - FLUSH WOOD DOORS
08 70 00 - FINISH HARDWARE
DIVISION 09 — FINISHES
09 29 00 - GYPSUM BOARD
09 91 00 - ARCHITECTURAL PAINTING
DIVISION 26 — ELECTRICAL
26 05 00 - COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 33 - RACEWAYS AND BOXES
26 50 00 - INTERIOR AND EXTERIOR LIGHTING
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
28 05 01 - COMMON WORK RESULTS FOR ELECTRONIC SECURITY SYSTEMS
28 10 01 - ACCESS CONTROL
28 20 01 - VIDEO SURVEILLANCE SYSTEM
28 46 00 - FIRE AND INTRUSION ALARM SYSTEM
SACN - 245498
00 01 10 - 1
This page intentionally left blank.
DIVISION
GENERAL REQUIREMENTS
This page intentionally left blank.
The beginning of the document. Download the full file to read on.