A PDF document (11.6 MB) attached to Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina, from the Department of the Navy. Due Oct 27, 2026, 2:00 PM (UTC-4).
File name: 1701820 SPC -FINAL.pdf
The full file is for paid members, or buy this bid alone.
Preview
eProjects Work Order
Number: 1701820
Appropriation:
P-1550 SOF MARINE RAIDER
BATTALION / COMPANY / TEAM FACILITIES
At the
MARINE CORPS BASE CAMP LEJEUNE, NC
DESIGNED BY:
NAVFAC MID-ATLANTIC
9742 MARYLAND AVENUE
NORFOLK, VIRGINIA 23511-3095
SPECIFICATION PREPARED BY:
Architectural: MBF Architects
Civil: Stantec
Structural: Kaydos-Daniels Engineering
Interior Design: Within Interior Design
Mechanical/Plumbing/Electrical: Crenshaw Consulting Eng. Fire Prot.: Jensen Hughes
Audio Video: Thorburn
Specification: Darden J. Eure, III, MBF Architects
8 May 2026
Date: 8 May 2026
SPECIFICATION APPROVED BY:
For Commander, NAVFAC MID-ATLANTIC:
Date: 13 May 2026 James E. Donahue, R.A.
This page is intentionally left blank.
P-1550 SOF MARINE RAIDER
BATTALION / COMPANY / TEAM FACILITIES
eProjects WON: 1701820
8 May 2026
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 30 02.00 22
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
01 31 23.13 20
08/23, CHG 1: 02/24
01 32 17.00 20
01 33 00
08/18, CHG 4: 02/21
01 33 29
02/21, CHG 1: 08/25
01 35 26
01 35 29.13
05/24, CHG 1: 05/25
11/15, CHG 1: 08/22
01 42 00
01 45 00
08/23, CHG 3: 08/25
01 45 35
01 50 00
01 57 19
01 58 00
08/19, CHG 5: 08/22
01 74 19
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 20
01 78 30.00 22
01 91 00.15 22
01 91 19
SUMMARY OF WORK
WORK RESTRICTIONS (MCBL)
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
SUSTAINABILITY REQUIREMENTS AND
REPORTING
HPSB CHECKLISTS
GOVERNMENTAL SAFETY REQUIREMENTS
HEALTH, SAFETY, AND EMERGENCY RESPONSE
PROCEDURES FOR CONTAMINATED SITES
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
SCHEDULE OF FIRE PROTECTION SYSTEM
INSPECTIONS BY FPQC SPECIALIST
SPECIAL INSPECTIONS
STATMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
PROJECT SIGN DETAILS
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
GIS DATA DELIVERABLES
TOTAL BUILDING COMMISSIONING
BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00
DEMOLITION
DIVISION 03 - CONCRETE
03 30 00
02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment B - PIEE Vendor Access Instructions
- Attachment C - Price Proposal Form
- Attachment D - Construction and Design Experience Project Data Sheet
- Attachment E - Past Performance Questionnaire
- Attachment F - Historical Small Business Utilization
- Attachment G - SPCD
- Attachment H -Small Business Subcontracting Plan
- Solicitation
- Amendment 1
- Attachment C - Price Proposal Form Revised
- Attachment I - DOD-CUI Non-Disclosure Agreement