eProjects Work Order
Number: 1701820
Appropriation:

P-1550 SOF MARINE RAIDER

BATTALION / COMPANY / TEAM FACILITIES

At the

MARINE CORPS BASE CAMP LEJEUNE, NC

DESIGNED BY:

NAVFAC MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK, VIRGINIA 23511-3095

SPECIFICATION PREPARED BY:

Architectural: MBF Architects
Civil: Stantec
Structural: Kaydos-Daniels Engineering
Interior Design: Within Interior Design
Mechanical/Plumbing/Electrical: Crenshaw Consulting Eng. Fire Prot.: Jensen Hughes
Audio Video: Thorburn
Specification: Darden J. Eure, III, MBF Architects

8 May 2026

Date: 8 May 2026

SPECIFICATION APPROVED BY:

For Commander, NAVFAC MID-ATLANTIC:
Date: 13 May 2026 James E. Donahue, R.A.

This page is intentionally left blank.

P-1550 SOF MARINE RAIDER

BATTALION / COMPANY / TEAM FACILITIES

eProjects WON: 1701820

8 May 2026

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15

LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00

01 14 00

01 20 00

01 30 00

01 30 02.00 22

11/20, CHG 5: 02/25
11/20, CHG 5: 02/25

01 31 23.13 20

08/23, CHG 1: 02/24

01 32 17.00 20

01 33 00

08/18, CHG 4: 02/21

01 33 29

02/21, CHG 1: 08/25

01 35 26

01 35 29.13

05/24, CHG 1: 05/25
11/15, CHG 1: 08/22

01 42 00

01 45 00

08/23, CHG 3: 08/25

01 45 35

01 50 00

01 57 19

01 58 00

08/19, CHG 5: 08/22

01 74 19

02/19, CHG 3: 11/21

01 78 00

01 78 23

01 78 24.00 20

01 78 30.00 22

01 91 00.15 22

01 91 19

SUMMARY OF WORK

WORK RESTRICTIONS (MCBL)

PRICE AND PAYMENT PROCEDURES

ADMINISTRATIVE REQUIREMENTS

DESIGN, PROCUREMENT, AND INSTALLATION

OF AUDIOVISUAL EQUIPMENT

ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

SUSTAINABILITY REQUIREMENTS AND

REPORTING

HPSB CHECKLISTS

GOVERNMENTAL SAFETY REQUIREMENTS

HEALTH, SAFETY, AND EMERGENCY RESPONSE

PROCEDURES FOR CONTAMINATED SITES

SOURCES FOR REFERENCE PUBLICATIONS

QUALITY CONTROL

SCHEDULE OF FIRE PROTECTION SYSTEM

INSPECTIONS BY FPQC SPECIALIST

SPECIAL INSPECTIONS

STATMENT OF SPECIAL INSPECTIONS

SCHEDULE OF SPECIAL INSPECTIONS

TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

TEMPORARY ENVIRONMENTAL CONTROLS

PROJECT IDENTIFICATION

PROJECT SIGN DETAILS

CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

CLOSEOUT SUBMITTALS

OPERATION AND MAINTENANCE DATA

FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

GIS DATA DELIVERABLES

TOTAL BUILDING COMMISSIONING

BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00

DEMOLITION

DIVISION 03 - CONCRETE

03 30 00

02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE