SPECIFICATIONS

REPLACE ROOF

BUILDING 347

PROJECT # 640A0-27-104

VETERANS AFFAIRS

PALO ALTO HEALTH CARE SYSTEM

MENLO PARK DIVISION

October 19, 2026

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

General Requirements

11-2021

Project Schedules (Small Projects – Design/Bid/Build

12-2025

Shop Drawings, Product Data, and Samples

03-2026

Safety Requirements for Major Projects

05-2024

Quality Control

02-2021

Construction Waste Management

04-2022

01 32 16.15

01 33 23

01 35 26

01 45 00

01 74 19

DIVISION 02 – EXISTING CONDITIONS

02 41 00

Demolition

08-2017

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19

Preparation for Re-Roofing

01-2021

Built-Up Bituminous Roofing

01-2021

Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing

08-2019

Thermoplastic Polyolefin (TPO) Roofing

01-2021

Fluid-Applied Roofing

01-2021

Flashing & Sheet Metal

01-2021

07 51 00

07 52 16.11

07 54 23

07 56 00

07 60 00

DIVISION 23 - HVAC

23 05 11

Common Work Results For HVAC

02-2023

HVAC and Boiler Plant Insulation

01-2020

HVAC Ducts And Casings

02-2023

23 07 11

23 31 00

DIVISION 26 – ELECTRICAL

26 05 11

Requirements for Electrical Installations

11-2022

Grounding and Bonding for Electrical Systems

11-2022

Raceway and Boxes for Electrical Systems

11-2022

26 05 26

26 05 33

SECTION 01 00 00

GENERAL REQUIREMENTS

1.9

PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site including demolition and removal of existing site features and furnish labor and materials and perform work indicated in the statement of work and construction documents.
B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer Representative (COR).
C. Before placement and installation of work subject to tests by Contractor’s testing laboratory the Contractor shall notify the COR in sufficient time to enable oversight for taking and testing of specimens by Contractor and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
D. All employees of general contractor and subcontractors shall comply

with

VA

security

management

program

and

obtain

permission of the VA police, be identified by project and employer, and restricted from unauthorized access.