Home / NC Pea Island NWR Fence at Red Wolf / Document

Statement Of Work 1

Updated

A PDF document (64 KB) attached to NC Pea Island NWR Fence at Red Wolf, from the Departmental Offices. Due Nov 24, 2026, 1:00 PM (UTC-5).

File name: A04_-_Statement_Of_Work_1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work
Sandy Ridge Facility Fence Repair at Alligator River NWR

1. General

Red Wolf Recovery Program, 100 Conservation Way, Manteo, NC 27954. The Red Wolf Recovery Program’s Sandy Ridge Facility contains 16 individual chain link holding pens used to temporarily house red wolves and coyotes while they are treated for injury/illness, during acclimation periods prior to release, and various other reasons. It is essential to Red Wolf Recovery Program operations, and it is enclosed by a 2,500 linear foot double perimeter chain link fence. The perimeter fence adds a layer of security to prevent escape, as well as keeping people and free-range wildlife from interacting with animals inside the facility. Over the years, the fence has become damaged and compromised in many areas, and no longer adequately holds wildlife in or out. The inner perimeter fence sits too close to existing holding pens, trees and vegetation to allow routine mowing and maintenance, is damaged in many areas, and needs to be removed. The exterior perimeter fence will remain in place, but is in need of repair of numerous holes and areas of significant structural damage. Additionally, one of the 16 holding pens is in a state of disrepair and needs to be removed, which will allow one corner of the perimeter fence to be moved out of standing water and to higher ground.

2. Place & Period of Performance

Location: Sandy Ridge Facility, Sandy Ridge Road, Alligator River National Wildlife Refuge in East Lake, North Carolina.
Latitude: 35.82765N
Longitude: -75.90331E
Period of Performance: The PoP will be 90 days from the time of award of the contract, but not prior to July 15, 2027 and ending by no later than October 15, 2027 to allow for Northern Long Eared Bat pup rearing. ESA Section 7 Consultation is being completed in coordination with the Raleigh, NC Ecological Services Field Office.

3. Scope

Work consists of providing all necessary equipment and labor to complete the following: 1. Remove approximately 2,600 linear feet of existing inner 8’ tall chain link fence. Remove approximately 250’ of outer 8’ tall chain link fence out of wet area. Remove one 50’x50’ holding pen. Leave all material on site to be hauled away by Refuge staff.

2. Repair existing outer 8’ tall chain link fence using existing materials from item 1 and install approximately 140’ of existing fence that was removed from wet area. 3. Dig out small amount of dirt and debris on ground and install 3’ tall 11 ½ gauge chain link dig

The beginning of the document. Download the full file to read on.

Other documents in this bid