Synopsis Of Proposed Contract Activity (PreSolicitation Notice) 1
Updated
A PDF document (131 KB) attached to NC Pea Island NWR Fence at Red Wolf, from the Departmental Offices. Due Nov 24, 2026, 1:00 PM (UTC-5).
File name: B01_-_Synopsis_Of_Proposed_Contract_Activity_(PreSolicitation_Notice)_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
In accordance with FAR 5.207, Preparation and Transmittal of Synopses.
THIS POST IS A PRE-SOLICITATION NOTICE/SYNOPSIS. THIS IS NOT THE
SOLICITATION AND DOES NOT CONSTITUTE A REQUEST FOR PROPOSAL,
QUOTE, OR INVITATION FOR BID. PLEASE READ THIS SYNOPSIS CAREFULLY
FOR ANTICIPATED SOLICITATION POSTING INFORMATION. THANK YOU. (1) Post Date/Year. 10 November 2026
(2) Action/Classification Code. Y - Construction
(3) Product or Service Code. Y1QA – CONSTRUCTION OF RESTORATION OF REAL
PROPERTY
(4) NAICS Code/Size Standard. 238990 – All Other Specialty Trade Contractors-Building and Property Specialty Trade Services, $19 Million
(5) Agency/Contracting Office Address/Zip Code. United States Department of Interior, Fish and Wildlife Joint Administrative Operations, FWS GAOA, 5275 Leesburg Pike, Falls Church, VA 22041
(6) Proposed Solicitation Number. 140FF027Q0071
(7) Synopsis Period. 10 November 2026 through 24 November 2026 (8) Proposed Solicitation Period. November 2026 through December 2026 (Estimated Dates)
(9) Subject. NC PEA ISLAND NWR FENCE at RED WOLF
(10) Description. The Red Wolf Recovery Program’s Sandy Ridge Facility uses 16 holding pens to temporarily house red wolves and coyotes for treatment, acclimation, and other management needs. The facilities, 2,500-foot double-perimeter fence has deteriorated over time, reducing its effectiveness at containing wildlife and preventing outside access. The project will remove the damaged inner fence, repair the existing outer fence, and remove one deteriorated holding pen to allow a section of fence to be relocated from standing water to higher ground. (11) Place of Contract Performance. Sandy Ridge Facility, Sandy Ridge Road, Alligator River National Wildlife Refuge in East Lake, North Carolina
(12) Contract Award Date. Anticipated January 2027.
(13) Contract Award Period of Performance. The anticipated Period of Performance for this contract is 90-calendar days from the actual date of Notice to Proceed (NTP) Letter. Anticipated Delivery Date for NTP Letter is 15 Days Following Initial Contract Award Date. (15) Contract Award Dollar Amount. It is anticipated that the price range of this contract will be: Between $100,000 and $200,000
(16) Source Selection Process. All proposals shall be evaluated in accordance with FAR Part 13 selection procedures.
In accordance with FAR 5.207, Preparation and Transmittal of Synopses.
(17) Pre-proposal Conference/Site Visit. Site visit information will be provided in the
The beginning of the document. Download the full file to read on.