Statement of Work
Updated
A PDF document (564 KB) attached to New Meadows Range Barn, from the Forest Service. Due Nov 28, 2026, 5:00 PM (UTC-7).
File name: C04c SOW 1240LT27Q0027.pdf
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work
GENERAL SPECIFICATIONS
NEW MEADOWS BARN LBP & DEFERRED MAINTENANCE
(Revised 10/26/2026)
1.1
SCOPE OF CONTRACT
A.
This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654.
B.
Base work includes the following described below:
1.
2.
3.
4.
C.
Optional work includes the following described below:
1.
D.
1.2
A.
1.3
Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing.
Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces.
Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces.
Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required.
Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers.
Quantities associated with these options are identified in the Schedule of Items.
PROJECT LOCATION
The project site is located at the Payette National Forest New Meadows Barracks Administrative Site, within the City of New Meadows, Idaho, at the following address: 100 S Norris Ave., New Meadows, ID 83654.
SITE INFORMATION AND LIMITATIONS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001
A.
The following site conditions are considered indirect to the contract and the contractor will not be paid directly for any of the following items: 1.
2.
3.
4.
5.
6.
1.4
A.
1.5
Construction site will be open to the public during construction. The Contractor
The beginning of the document. Download the full file to read on.