STATEMENT OF WORK

B170 Courtyard Window Re-caulk
Forts Roots Veteran Hospital
Central Arkansas Veterans Healthcare System (CAVHS)
North Little Rock, AR

Background: There are gaps between the wall and TPO beneath the horizontal window base caps and flashing in the 1B and 1C patio in BLDG 170. This is allowing water to infiltrate into the newly renovated rooms G101A, G101B, and GF100.

Scope: The contractor shall provide all labor, materials, tools, personnel, supervision, transportation, and equipment to prevent water from entering the ground floor at the Eugene J. Towbin Veterans’ Healthcare Center at 2200 Fort Roots Dr, North Little Rock, AR 72114. General Requirements

Patio Level Repairs:
Check TPO for damage around the cant strip, notate any deficiencies Install a termination bar using the correct fasteners for material behind it Seal between the wall, TPO, and termination bar with specialized polyether, high grade polyurethane. Use specific TPO compatible self-leveling and non-sag lap sealant or butyl-based sealant. Seal on top of termination bar with specialized polyether, high grade polyurethane. Use specific TPO compatible self-leveling and non-sag lap sealant or butyl-based sealant. Reattach horizontal and vertical face caps to proper location Replace missing face caps
Dispose of metal flashing and seal old screw holes with aluminum pop rivets and sealant

Safety Requirements:
Contractors must ensure compliance with the VHA and OSHA Safety Requirements listed under Fall Protection and Scaffolds and Other Work Platforms.

Responsibilities of the Contractor
Ensure sealant follows the VA TPO Specifications (VA Master Spec 07 54 23) Do not stack pave stones more than six pave stones high Store plastic pave stone supports in a location where they can be located again to be reused. Contractor is responsible for all Staging equipment
Remove excess weight from the floor membrane by moving pavers away from the staging equipment. If required, the contractor is also responsible for disassembling and reassembling the metal awning above the entrance to the courtyard, as it’s connected to some of the vertical frames and it may prevent contractors from accessing some of the window frames. Remove any smudging on windows that occurred during work Restore Pavers to original project condition
Contractor is responsible for damage to curtainwall components Perform final clean-up of the area before leaving the site Government Observed Holidays: The Government hereby provides notice, and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays: