STATEMENT OF WORK

Commercial Wi-Fi Internet

FOR AFLCMC/GBH

1960 1st Street West Building 977
Randolph AFB, TX 78150-4453

1. SCOPE OF WORK

The Contractor shall provide all management, tools, supplies, equipment, transportation, materials, and labor necessary to provide commercial Wi-Fi service in Building 977. This includes two primary objectives:
1. Re-establishing Commercial Wi-Fi Service: Restoring and providing ongoing monthly commercial Wi-Fi internet service throughout the previously serviced areas of Building 977. 2. First-Floor Extension: Engineering, extending, and installing commercial Wi-Fi coverage to the first floor (C and D wings), including circuit testing, troubleshooting, and conducting a post-installation Heat Map to determine optimal wireless access point placement and signal coverage.
All required project documentation, technical layouts, and drawings shall be delivered in accordance with Section 3.9 and applicable Contract Data Requirements Lists (CDRLs).

2. PERIOD OF PERFORMANCE

The period of performance shall consist of a base year (12 months) and four (4) one-year optional renewal periods, for a total potential performance period of five (5) years. Continued Wi-Fi service shall be provided on a monthly recurring basis throughout the active period of performance.

3. SPECIFIC REQUIREMENTS / DESCRIPTION OF SERVICES

3.1. COMMERCIAL INTERNET BLDG 977

The Contractor shall provide, operate, and maintain commercial internet services in Building 977 (approximately 41,000 sq ft).

Existing Building Coverage: The Contractor shall establish fully operational commercial Wi-Fi service across all currently equipped areas of Building 977 no later than ten (10) business days after contract award.



First-Floor Extension Schedule: The Contractor shall submit a detailed project schedule within five (5) business days after contract award. This schedule shall specifically outline the timeline and milestones to complete all engineering, cabling, equipment installation, and testing needed to extend Wi-Fi service to the first floor (C and D wings) within thirty (30) calendar days after award.
Circuit Bandwidth: The Contractor shall provide a dedicated commercial circuit delivering a minimum of 500 Mbps symmetrical bandwidth (500 Mbps download / 500 Mbps upload). Hardware & Materials: The Contractor is responsible for furnishing all necessary hardware, materials, and cabling.
Coverage Area: The Contractor shall provide complete wireless access coverage across all