Statement of Work
Updated
A PDF document (291 KB) attached to CGC Diligence Tug Services, from the US Coast Guard. Due Nov 7, 2026, 3:00 PM (UTC-5).
File name: Statement of Work (SOW) 12102PR270000007.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK (SOW)
PR 12102PR270000007
USCGC DILIGENCE TUG
1. BACKGROUND
The United States Coast Guard Cutter (USCGC) DILIGENCE requires commercial harbor tug services to assist during its scheduled return to its homeport at Naval Air Station Pensacola. Professional tug assistance is required to ensure the vessel safely transits to the main shipping channel, turns in the basin and moors up at the pier without risk to the cutter, shore infrastructure, or surrounding vessels.
2. OBJECTIVE
The objective of this SOW is to secure a qualified vendor to arrange professional tugboat service to support the safe inbound transit of CGC DILIGENCE from sea to NAS Pensacola Charlie Middle Pier.
3.
SCOPE
The Contractor shall provide qualified personnel, one (1) appropriate tug vessel, and make all necessary arrangements to perform the following:
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 Transit Services.
2.1.1 Sea to NAS Pensacola Charlie Pier, Pensacola, FL for inbound transit. 2.2 Standbye Requirements.
2.2.1 Assist tug shall be standing by for scheduled evolution thirty minutes prior to the initiation of transit. (QTY 1)
3.0 CONTRACTOR PERSONNEL
The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW.
LAST UPDATED: XX/XX/XXXX
4.0 PERIOD OF PERFORMANCE
The period of performance for the inbound service is November 9th 2026. USCGC Diligence will be Arriving at NAS Pensacola at 10:00am CST. From November 7th through the 8th, CGC Diligence reserves the right to make any necessary adjustments to the period of performance as needed. CGC Diligence will confirm the required tug-service timing directly with the tug company or subcontractor no later than 24–48 hours before the applicable period of performance.
5.0 PLACE OF PERFORMANCE
Naval Air Station Pensacola Charlie Pier,
Pensacola, FL, 32508
6.0 Vessel Specifications (CGC Diligence)
To facilitate accurate planning, and tug sizing, the Contractor shall base all operational arrangements on the following vessel specifications. The Contractor must brief all assigned tug captains on these constraints prior to the evolution:
•
Vessel Type: Reliance-Class Medium Endurance Cutter (WMEC)
•
Length Overall (LOA): 210 feet (64 meters)
The beginning of the document. Download the full file to read on.