Statement of Work - Facility Signage Update -rv1
Updated
A PDF document (353 KB) attached to Facility 30011 - Facility Signage Update, from the Department of the Air Force. Due Nov 25, 2026, 4:00 PM (UTC-5).
File name: SOW - F30011 Facility Signage Update -rv1 .pdf
The full file is for paid members, or buy this bid alone.
Preview
01-SOW Statement of Work -Furniture/Signage Package
Wright Patterson AFB, OH
Signage
Statement of Work
Date: 10/5/2026
Facility# 30011 (F/30011)
Area A
5151 Wright Ave
Wright-Patterson Air Force Base, OH 45433
F30011 Building Signage 2026TP036
ID Project #: 2026TP-036
Tina Penick
Interior Design Specialist
Wright Patterson AFB
CEG-Interior Design Specialist
5151 Wright Ave, Building 11
WPAFB, OH 45433-5339
937-656-3452
DAF version 28JULY2026
01-SOW Statement of Work -Furniture/Signage Package
Wright Patterson AFB, OH
Revision History
Author Name
Date
DAF version 28JULY2026
Reason For Changes
Version
01-SOW Statement of Work -Furniture/Signage Package
Wright Patterson AFB, OH
1.0 Scope
This Signage Package is for FACILITY# 30011, WPAFB, Ohio, Signage to be remove existing signage, patch/painted if necessary to match existing walls, ordered, delivered and installed per UFC and NFPA101 Code.
This project will be awarded on a competitive basis using total project cost.
ALL PROJECTS:
The Contractor shall provide ALL supervision, labor, materials, equipment, including transportation to accomplish this project in accordance with this Statement of Work (SOW), project drawings.
The Contractor shall provide 30 days storage, and the requirements contained in the soliciting documents.
The Contractor shall include an itemized quote that includes labor to receive, inspect, deliver to project job site, and install product per approved final design layout. The Contractor shall provide 3D Renderings of each typical. The Contractor may include AutoCAD design hours for all phases of design (initial, revisions and final).
o No CAD files will be provided unless the vendor is NIST SP800-171 Certified Level 1 (until 9-NOV-2026 or after Level 2). Once awarded and after completion of construction if applicable, contractor is responsible for field verifying space. The Contractor may include design hours for in person meetings to review all phases of design (initial, revisions and final), finish selections, site visits (field measurement), and any other means and methods for the contractor to execute the project. For this project repair/replace flooring and ceiling, where applicable if damaged upon installation of project. All patch and repair should be consistent finish level of the existing wall with no paint lines visible from patch.
The Contractor shall provide products from a single manufacturer to achieve uniformity in finish and appearance within office/space. Reference basis of design per product for
The beginning of the document. Download the full file to read on.