Home / Hickman Wildlife Water Catchment and Pipe Fence / Document

Statement of Work Hickman Water Catchment and Fence

Updated

A PDF document (361 KB) attached to Hickman Wildlife Water Catchment and Pipe Fence, from the Bureau of Land Management. Due Nov 9, 2026, 3:00 PM (UTC-5).

File name: A04_-_SOW_Hickman_Water_Catchment_and_Fence.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SFO - 2026 Hickman Wildlife Water and Fence
Socorro County, New Mexico
Specifications
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to provide repair and alteration of existing infrastructure. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. 1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the specified tasks as defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall meet the standards in the specifications. 1.2 Background: The Bureau of Land Management-Socorro Field Office (BLM-SFO) is implementing a wildlife water development project. Water resource management projects, including catchments, are critical for sustaining wildlife, especially in a state with limited rainfall and high evaporation rates. They provide drinking water, nesting sites, and corridors for migratory and resident species. 1.3 Objectives: Project includes tear down and removal of existing infrastructure (fence and catchment), hauling away all material except the t-post removed from the old fence which BLM will keep and haul and setting of two BOSS Tanks, building a 1,000 sq-ft metal catchment, construction of a support frame on outer side of tanks (if tanks cannot be buried), and a 1,000 linear foot/1.5-acre pipe and cable fence. If tanks cannot be set at ground level, an access ramp will be constructed and/or installed. Catchment will be constructed of pipes and purlins, with a propanel top.
The water catchment is composed of two 20’ X 25’ structures which slope inward and drain into a 6” galvanized gutter 1,000 square-foot metal catchment. The fence shall be constructed of a pipe top rail and cable.
1.4 Scope: The contractor shall assess, plan, and execute all demolition, repair, and alterations necessary to meet the specification in Part 5 of this document. This includes all materials, equipment, personnel, permitting, and administration.
1.5 Period of Performance: September 21, 2026 - November 20, 2026 or 60 days from award if before or after September 21, 2026.

1.6 General Information

The beginning of the document. Download the full file to read on.

Other documents in this bid